Bi-objective optimisation for integrated scheduling of single machine with setup times and preventive maintenance planning

被引:17
|
作者
Wang, Shijin [1 ]
机构
[1] Tongji Univ, Dept Management Sci & Engn, Sch Econ & Management, Shanghai 200092, Peoples R China
基金
美国国家科学基金会;
关键词
single-machine scheduling problem; sequence-dependent setup times; preventive maintenance; multi-objective optimisation; genetic algorithm; GENETIC ALGORITHM APPROACH; FLOW-SHOPS; JOB-SHOP; AVAILABILITY; CONSTRAINTS; TASKS;
D O I
10.1080/00207543.2013.765070
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper deals with an integrated bi-objective optimisation problem for production scheduling and preventive maintenance in a single-machine context with sequence-dependent setup times. To model its increasing failure rate, the time to failure of the machine is subject to Weibull distribution. The two objectives are to minimise the total expected completion time of jobs and to minimise the maximum of expected times of failure of the machine at the same time. During the setup times, preventive maintenance activities are supposed to be performed simultaneously. Due to the assumption of non-preemptive job processing, three resolution policies are adapted to deal with the conflicts arising between job processing and maintenance activities. Two decisions are to be taken at the same time: find the permutation of jobs and determine when to perform the preventive maintenance. To solve this integrated problem, two well-known evolutionary genetic algorithms are compared to find an approximation of the Pareto-optimal front, in terms of standard multi-objective metrics. The results of extensive computational experiments show the promising performance of the adapted algorithms.
引用
收藏
页码:3719 / 3733
页数:15
相关论文
共 50 条
  • [1] A Customized IMOEA/D for Bi-Objective Single-Machine Scheduling with Adaptive Preventive Maintenance
    Wang, Na
    Wu, Fang
    Wang, Hongfeng
    [J]. MACHINES, 2023, 11 (09)
  • [2] Bi-objective single machine scheduling problem with stochastic processing times
    Salmasnia, Ali
    Khatami, Mostafa
    Kazemzadeh, Reza Baradaran
    Zegordi, Seyed Hessameddin
    [J]. TOP, 2015, 23 (01) : 275 - 297
  • [3] Bi-objective single machine scheduling problem with stochastic processing times
    Ali Salmasnia
    Mostafa Khatami
    Reza Baradaran Kazemzadeh
    Seyed Hessameddin Zegordi
    [J]. TOP, 2015, 23 : 275 - 297
  • [4] Multi-objective integrated optimization research on preventive maintenance planning and production scheduling for a single machine
    Jin Yulan
    Jiang Zuhua
    Hou Wenrui
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2008, 39 (9-10): : 954 - 964
  • [5] Multi-objective integrated optimization research on preventive maintenance planning and production scheduling for a single machine
    Jin Yulan
    Jiang Zuhua
    Hou Wenrui
    [J]. The International Journal of Advanced Manufacturing Technology, 2008, 39 : 954 - 964
  • [6] Bi-objective optimization of identical parallel machine scheduling with flexible maintenance and job release times
    Chen, Yarong
    Guan, Zailin
    Wang, Chen
    Chou, Fuh-Der
    Yue, Lei
    [J]. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING COMPUTATIONS, 2022, 13 (04) : 457 - 472
  • [7] Genetic algorithms for integrated preventive maintenance planning and production scheduling for a single machine
    Sortrakul, N
    Nachtmann, HL
    Cassady, CR
    [J]. COMPUTERS IN INDUSTRY, 2005, 56 (02) : 161 - 168
  • [8] Fuzzy bi-objective formulation for a parallel machine scheduling problem with machine eligibility restrictions and sequence-dependent setup times
    Naderi-Beni, Mahdi
    Ghobadian, Ehsan
    Ebrahimnejad, Sadoullah
    Tavakkoli-Moghaddam, Reza
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2014, 52 (19) : 5799 - 5822
  • [9] Bi-objective Optimization for Scheduling on Identical Parallel Machine Considering Preventive Maintenance and Job's Release Time
    Shen, Chunchun
    Chen, Yarong
    Chou, Fuh-Der
    Huang, Peiyu
    [J]. 2021 3RD INTERNATIONAL CONFERENCE ON MACHINE LEARNING, BIG DATA AND BUSINESS INTELLIGENCE (MLBDBI 2021), 2021, : 630 - 637
  • [10] Single-machine-based production scheduling model integrated preventive maintenance planning
    Ershun Pan
    Wenzhu Liao
    Lifeng Xi
    [J]. The International Journal of Advanced Manufacturing Technology, 2010, 50 : 365 - 375