Bi-objective optimisation for integrated scheduling of single machine with setup times and preventive maintenance planning

被引:17
|
作者
Wang, Shijin [1 ]
机构
[1] Tongji Univ, Dept Management Sci & Engn, Sch Econ & Management, Shanghai 200092, Peoples R China
基金
美国国家科学基金会;
关键词
single-machine scheduling problem; sequence-dependent setup times; preventive maintenance; multi-objective optimisation; genetic algorithm; GENETIC ALGORITHM APPROACH; FLOW-SHOPS; JOB-SHOP; AVAILABILITY; CONSTRAINTS; TASKS;
D O I
10.1080/00207543.2013.765070
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper deals with an integrated bi-objective optimisation problem for production scheduling and preventive maintenance in a single-machine context with sequence-dependent setup times. To model its increasing failure rate, the time to failure of the machine is subject to Weibull distribution. The two objectives are to minimise the total expected completion time of jobs and to minimise the maximum of expected times of failure of the machine at the same time. During the setup times, preventive maintenance activities are supposed to be performed simultaneously. Due to the assumption of non-preemptive job processing, three resolution policies are adapted to deal with the conflicts arising between job processing and maintenance activities. Two decisions are to be taken at the same time: find the permutation of jobs and determine when to perform the preventive maintenance. To solve this integrated problem, two well-known evolutionary genetic algorithms are compared to find an approximation of the Pareto-optimal front, in terms of standard multi-objective metrics. The results of extensive computational experiments show the promising performance of the adapted algorithms.
引用
收藏
页码:3719 / 3733
页数:15
相关论文
共 50 条
  • [41] Bi-objective optimization of a single machine batch scheduling problem with energy cost consideration
    Wang, Shijin
    Liu, Ming
    Chu, Feng
    Chu, Chengbin
    [J]. JOURNAL OF CLEANER PRODUCTION, 2016, 137 : 1205 - 1215
  • [42] Bi-objective optimization for single-machine batch scheduling considering energy cost
    Cheng, Junheng
    Chu, Feng
    Xia, Weili
    Ding, Jianxun
    Ling, Xiang
    [J]. 2014 INTERNATIONAL CONFERENCE ON CONTROL, DECISION AND INFORMATION TECHNOLOGIES (CODIT), 2014, : 236 - 241
  • [43] On the single machine scheduling problem with sequence-dependent setup times and periodic maintenance
    Krim, Hanane
    Benmansour, Rachid
    Duvivier, David
    [J]. 2018 5TH INTERNATIONAL CONFERENCE ON CONTROL, DECISION AND INFORMATION TECHNOLOGIES (CODIT), 2018, : 374 - 378
  • [44] A bi-objective optimization approach for the maintenance planning of networked systems
    Li, Wanshan
    Zhang, Chi
    [J]. QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2020, 36 (04) : 1364 - 1385
  • [45] Genetic algorithms for total weighted expected tardiness integrated preventive maintenance planning and production scheduling for a single machine
    Sortrakul, Navadon
    Cassady, C. Richard
    [J]. JOURNAL OF QUALITY IN MAINTENANCE ENGINEERING, 2007, 13 (01) : 49 - +
  • [46] Bi-objective green scheduling in uniform parallel machine environments
    Safarzadeh, Hamid
    Niaki, Seyed Taghi Akhavan
    [J]. JOURNAL OF CLEANER PRODUCTION, 2019, 217 : 559 - 572
  • [47] Scheduling preventive maintenance on a single CNC machine
    Gurel, Sinan
    Akturk, M. Selim
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2008, 46 (24) : 6797 - 6821
  • [48] Bi-objective Optimization in Identical Parallel Machine Scheduling Problem
    Bathrinath, Sankaranarayanan
    Sankar, S. Saravana
    Ponnambalam, S. G.
    Kannan, B. K. V.
    [J]. SWARM, EVOLUTIONARY, AND MEMETIC COMPUTING, PT I (SEMCCO 2013), 2013, 8297 : 377 - 388
  • [49] Integrated Preventive Maintenance Scheduling Model with Redundancy for Cutting Tools on a Single Machine
    Tavassoli, Leyla Sadat
    Sakhavand, Nahal
    Fazeli, Seyed Sajjad
    [J]. ENGINEERING TECHNOLOGY & APPLIED SCIENCE RESEARCH, 2020, 10 (06) : 6542 - 6548
  • [50] An approach for bi-objective maintenance scheduling on a networked system with limited resources
    Urbani, Michele
    Brunelli, Matteo
    Punkka, Antti
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2023, 305 (01) : 101 - 113