Multi-objective integrated optimization research on preventive maintenance planning and production scheduling for a single machine

被引:55
|
作者
Jin Yulan [1 ]
Jiang Zuhua [1 ]
Hou Wenrui [1 ]
机构
[1] Shanghai Jiao Tong Univ, Sch Mech Engn, Shanghai 200240, Peoples R China
关键词
Preventive maintenance planning; Production scheduling; Multi-objective optimization; Genetic algorithm;
D O I
10.1007/s00170-007-1268-5
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Preventive maintenance (PM) planning and production scheduling are among the most important problems in the manufacturing industries. Researchers have begun to investigate the integrated optimization problem of PM and production scheduling with a single objective. However, many industries have trade-offs in their scheduling problems where multiple objectives must be considered in order to optimize the overall performance of the system. In this paper, five objectives, including minimizing maintenance cost, makespan, total weighted completion time of jobs, total weighted tardiness, and maximizing machine availability are simultaneously considered to optimize the integrated problem of PM and production scheduling introduced by Cassady and Kutanoglu. Multi-objective genetic algorithm (MOGA) is used to solve the integrated optimization problem. To illuminate the conflicting nature of the objective functions, decision-makers' preferences of the multiple objectives are not integrated into the MOGA. The total weighted percent deviation, which represents not only the preferences of the objectives but also the deviations of the solutions, is proposed to help decision-makers select the best solution among the near-Pareto optimal solutions obtained by the MOGA. A numerical example reveals the necessity and significance of integrating optimization of PM and production scheduling considering multiple objectives.
引用
收藏
页码:954 / 964
页数:11
相关论文
共 50 条
  • [1] Multi-objective integrated optimization research on preventive maintenance planning and production scheduling for a single machine
    Jin Yulan
    Jiang Zuhua
    Hou Wenrui
    [J]. The International Journal of Advanced Manufacturing Technology, 2008, 39 : 954 - 964
  • [2] Multi-objective optimization of parallel machine scheduling integrated with multi-resources preventive maintenance planning
    Wang, Shijin
    Liu, Ming
    [J]. JOURNAL OF MANUFACTURING SYSTEMS, 2015, 37 : 182 - 192
  • [3] Multi-objective group scheduling optimization integrated with preventive maintenance
    Liao, Wenzhu
    Zhang, Xiufang
    Jiang, Min
    [J]. ENGINEERING OPTIMIZATION, 2017, 49 (11) : 1890 - 1904
  • [4] Multi-objective Integrated Optimization Problem of Preventive Maintenance Planning and Flexible Job-Shop Scheduling
    Jing, Zha
    Hua, Jin
    Yi, Zhu
    [J]. PROCEEDINGS OF THE 23RD INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT 2016: THEORY AND APPLICATION OF INDUSTRIAL ENGINEERING, 2017, : 137 - 141
  • [5] Multi-Objective Optimization of Flexible Period Preventive Maintenance on A Single Machine
    Jin, Yu-Lan
    [J]. 2012 INTERNATIONAL CONFERENCE ON QUALITY, RELIABILITY, RISK, MAINTENANCE, AND SAFETY ENGINEERING (ICQR2MSE), 2012, : 475 - 479
  • [6] Genetic algorithms for integrated preventive maintenance planning and production scheduling for a single machine
    Sortrakul, N
    Nachtmann, HL
    Cassady, CR
    [J]. COMPUTERS IN INDUSTRY, 2005, 56 (02) : 161 - 168
  • [7] Single-machine-based production scheduling model integrated preventive maintenance planning
    Ershun Pan
    Wenzhu Liao
    Lifeng Xi
    [J]. The International Journal of Advanced Manufacturing Technology, 2010, 50 : 365 - 375
  • [8] Single-machine-based production scheduling model integrated preventive maintenance planning
    Pan, Ershun
    Liao, Wenzhu
    Xi, Lifeng
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 50 (1-4): : 365 - 375
  • [9] Integrating preventive maintenance planning and production scheduling for a single machine
    Cassady, CR
    Kutanoglu, E
    [J]. IEEE TRANSACTIONS ON RELIABILITY, 2005, 54 (02) : 304 - 309
  • [10] A Multi-Objective Modeling Approach for Integrated Manufacturing and Preventive Maintenance Planning
    Moghaddam, Kamran S.
    [J]. OPERATIONS AND SUPPLY CHAIN MANAGEMENT-AN INTERNATIONAL JOURNAL, 2021, 14 (01): : 83 - 99