AN IMPROVED TIME-COST TRADE-OFF MODEL WITH OPTIMAL LABOR PRODUCTIVITY

被引:9
|
作者
Lin, Chien-Liang [1 ]
Lai, Yu-Che [1 ]
机构
[1] Natl Kaohsiung Univ Sci & Technol, Dept Construct Engn, Kaohsiung, Taiwan
关键词
labor productivity; time-cost trade-off; optimization; genetic algorithm; CONSTRUCTION; OPTIMIZATION; DESIGN; ACCELERATION;
D O I
10.3846/jcem.2020.11663
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Optimization of the time-cost trade off (TCT) has received considerable attention for several decades. However, few studies have considered improving performance/productivity of existing crews. To shorten the gap to real-world applications, this study presents an improved TCT model that considers variable productivity using genetic algorithms (GAs). Through an illustrative case and a real world case, the results demonstrate that improving labor productivity of selected activities by allocating existing crews and management can yield an optimized solution. As such, a decision maker can implement a better optimized technique to reduce a project duration under budget while reducing the risk of liquidated damages. The main contribution of this study is to apply managerial improvement of labor productivity to TCT optimization, the project duration can be reduced owing to improved productivity of existing crews rather than inefficient overmanning, overlapping or costly substitution. In the end, three important managerial insights are presented and future research is recommended.
引用
收藏
页码:113 / 130
页数:18
相关论文
共 50 条
  • [21] An evolutionary stochastic discrete time-cost trade-off method
    Hussein, Bahaa
    Moselhi, Osama
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2019, 46 (07) : 581 - 600
  • [22] New fuzzy models for time-cost trade-off problem
    Ke, Hua
    Ma, Weimin
    Gao, Xin
    Xu, Weihua
    FUZZY OPTIMIZATION AND DECISION MAKING, 2010, 9 (02) : 219 - 231
  • [23] Time-cost trade-off optimization model for retrofitting planning projects using MOGA
    Patil A.S.
    Agarwal A.K.
    Sharma K.
    Trivedi M.K.
    Asian Journal of Civil Engineering, 2024, 25 (5) : 3823 - 3833
  • [24] A Dependent-Chance Programming Model for Fuzzy Time-Cost Trade-off Problem
    Ke, Hua
    Ma, Weimin
    2009 IEEE INTERNATIONAL CONFERENCE ON FUZZY SYSTEMS, VOLS 1-3, 2009, : 2183 - 2186
  • [25] New Time-Cost Trade-Off Model Considering the Sequence of Alternatives Between Activities
    Kang, Namuk
    Son, Jaeho
    Lee, Seunghyun
    JOURNAL OF ASIAN ARCHITECTURE AND BUILDING ENGINEERING, 2015, 14 (02) : 379 - 386
  • [26] A FLOW-PRESERVING ALGORITHM FOR THE TIME-COST TRADE-OFF PROBLEM
    TUFEKCI, S
    IIE TRANSACTIONS, 1982, 14 (02) : 109 - 113
  • [27] A crashing-based time-cost trade-off model considering quality cost and contract clauses
    Akin, Firat Dogu
    Polat, Gul
    Turkoglu, Harun
    Damci, Atilla
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2021, 23 (06) : 954 - 963
  • [28] Time-Cost Trade-off Problems of Engineering Project with Running Income
    Li, Hongxian
    Ouyang, Hongxiang
    2008 INTERNATIONAL CONFERENCE ON RISK MANAGEMENT AND ENGINEERING MANAGEMENT, ICRMEM 2008, PROCEEDINGS, 2008, : 9 - +
  • [29] Modeling project time-cost trade-off in fuzzy random environment
    Ke, Hua
    Ma, Junjie
    APPLIED SOFT COMPUTING, 2014, 19 : 80 - 85
  • [30] Time-cost trade-off in a multi-choice assignment problem
    Singh, Shalabh
    Singh, Sonia
    ENGINEERING OPTIMIZATION, 2022, 54 (04) : 576 - 592