Prioritising and scheduling road projects by genetic algorithm

被引:7
|
作者
Qiu, M
机构
关键词
D O I
10.1016/S0378-4754(97)82761-9
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The optimum timetable for implementing a set of road projects so as to achieve maximum investment effectiveness can be found by ranking or Goal Programming (GP) under the assumption that the payoffs of all the projects are divisible and proportional to their proportions undertaken. This assumption is valid for upgrading projects (Type I) but not for new ones (Type 2). When this difference is taken into account, neither ranking nor GP are effective methods to find the optimum timetable. This paper develops a genetic algorithm (GA) to address this problem. The GA uses the ranking vector of the projects as a GA individual and then transforms it into a project proportion matrix by imposing the budget constraint. Experiments show that the GA can find the optimum solution with an acceptable accuracy, and when the projects are differentiated between Type 1 and 2, the GA finds the optimum timetable that is different from that in the case of all Type 1 projects.
引用
收藏
页码:569 / 574
页数:6
相关论文
共 50 条
  • [1] Genetic algorithm for selecting and scheduling interdependent projects
    Jong, JC
    Schonfeld, P
    JOURNAL OF WATERWAY PORT COASTAL AND OCEAN ENGINEERING, 2001, 127 (01) : 45 - 52
  • [2] Scheduling Optimization of Prefabricated Construction Projects by Genetic Algorithm
    Xie, Linlin
    Chen, Yajiao
    Chang, Ruidong
    APPLIED SCIENCES-BASEL, 2021, 11 (12):
  • [3] Automated Resource Scheduling for Construction Projects Using Genetic Algorithm
    Moharram, Raghda M.
    Essawy, Yasmeen A. S.
    Hosny, Osama S.
    PROCEEDINGS OF THE CANADIAN SOCIETY OF CIVIL ENGINEERING ANNUAL CONFERENCE 2022, VOL 1, CSCE 2022, 2023, 363 : 513 - 522
  • [4] Value-Based Multiple Software Projects Scheduling with Genetic Algorithm
    Xiao, Junchao
    Wang, Qing
    Li, Mingshu
    Yang, Qiusong
    Xie, Lizi
    Liu, Dapeng
    TRUSTWORTHY SOFTWARE DEVELOPMENT PROCESSES, PROCEEDINGS, 2009, 5543 : 50 - 62
  • [5] A genetic algorithm-based method for scheduling repetitive construction projects
    Long, Luong Duc
    Ohsato, Ario
    AUTOMATION IN CONSTRUCTION, 2009, 18 (04) : 499 - 511
  • [6] Resource scheduling of construction projects using a hybrid genetic algorithm model
    Senouci, AB
    Naji, KK
    SYSTEM-BASED VISION FOR STRATEGIC AND CREATIVE DESIGN, VOLS 1-3, 2003, : 205 - 209
  • [7] Improved genetic algorithm for resource-constrained scheduling of large projects
    Kim, Jin-Lee
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2009, 36 (06) : 1016 - 1027
  • [8] MRDPGA: a multiple restart dynamic population genetic algorithm for scheduling road traffic
    Babangida Zachariah
    Sanjay Misra
    Philip O. Odion
    Saidu R. Isah
    Journal of Electrical Systems and Information Technology, 10 (1)
  • [9] An efficient hybrid genetic algorithm for scheduling projects with resource constraints and multiple execution modes
    Lova, Antonio
    Tormos, Pilar
    Cervantes, Mariamar
    Barber, Federico
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2009, 117 (02) : 302 - 316
  • [10] Prioritising railway projects for investment
    Ahern, A.
    Tapley, N.
    Anandarajah, G.
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-TRANSPORT, 2006, 159 (04) : 153 - 157