Prioritising and scheduling road projects by genetic algorithm

被引:7
|
作者
Qiu, M
机构
关键词
D O I
10.1016/S0378-4754(97)82761-9
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The optimum timetable for implementing a set of road projects so as to achieve maximum investment effectiveness can be found by ranking or Goal Programming (GP) under the assumption that the payoffs of all the projects are divisible and proportional to their proportions undertaken. This assumption is valid for upgrading projects (Type I) but not for new ones (Type 2). When this difference is taken into account, neither ranking nor GP are effective methods to find the optimum timetable. This paper develops a genetic algorithm (GA) to address this problem. The GA uses the ranking vector of the projects as a GA individual and then transforms it into a project proportion matrix by imposing the budget constraint. Experiments show that the GA can find the optimum solution with an acceptable accuracy, and when the projects are differentiated between Type 1 and 2, the GA finds the optimum timetable that is different from that in the case of all Type 1 projects.
引用
收藏
页码:569 / 574
页数:6
相关论文
共 50 条
  • [21] Codelet Scheduling by Genetic Algorithm
    Pei, Songwen
    Wang, Jinkai
    Cui, Wenyang
    Jiang, Linhua
    Geng, Tongsheng
    Gaudiot, Jean-Luc
    Zuckerman, Stephane
    2016 IEEE TRUSTCOM/BIGDATASE/ISPA, 2016, : 1492 - 1499
  • [22] A GENETIC ALGORITHM FOR MULTIPROCESSOR SCHEDULING
    HOU, ESH
    ANSARI, N
    REN, H
    IEEE TRANSACTIONS ON PARALLEL AND DISTRIBUTED SYSTEMS, 1994, 5 (02) : 113 - 120
  • [23] Genetic Algorithm for Scheduling Courses
    Budhi, Gregorius Satia
    Gunadi, Kartika
    Wibowo, Denny Alexander
    INTELLIGENCE IN THE ERA OF BIG DATA, ICSIIT 2015, 2015, 516 : 51 - 63
  • [25] Production based scheduling method for linear construction in road projects
    Kannan, S. R.
    Senthil, R.
    KSCE JOURNAL OF CIVIL ENGINEERING, 2014, 18 (05) : 1292 - 1301
  • [26] Production based scheduling method for linear construction in road projects
    S. R. Kannan
    R. Senthil
    KSCE Journal of Civil Engineering, 2014, 18 : 1292 - 1301
  • [27] A genetic algorithm-based method for look-ahead scheduling in the finishing phase of construction projects
    Dong, Ning
    Ge, Dongdong
    Fischer, Martin
    Haddad, Zuhair
    ADVANCED ENGINEERING INFORMATICS, 2012, 26 (04) : 737 - 748
  • [28] An effective mirror-based genetic algorithm for scheduling multi-mode resource constrained projects
    Zamani, Reza
    COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 127 : 914 - 924
  • [29] Scheduling programs with repetitive projects: A comparison of a simulated annealing, a genetic and a pair-wise swap algorithm
    Shtub, A
    LeBlanc, LJ
    Cai, ZY
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 88 (01) : 124 - 138
  • [30] Genetic Algorithm-based Optimal Investment Scheduling for Public Rental Housing Projects in South Korea
    Park, Jae Ho
    Yu, Jung Suk
    Geem, Zong Woo
    INTERNATIONAL JOURNAL OF FUZZY LOGIC AND INTELLIGENT SYSTEMS, 2018, 18 (02) : 135 - 145