Prioritising and scheduling road projects by genetic algorithm

被引:7
|
作者
Qiu, M
机构
关键词
D O I
10.1016/S0378-4754(97)82761-9
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The optimum timetable for implementing a set of road projects so as to achieve maximum investment effectiveness can be found by ranking or Goal Programming (GP) under the assumption that the payoffs of all the projects are divisible and proportional to their proportions undertaken. This assumption is valid for upgrading projects (Type I) but not for new ones (Type 2). When this difference is taken into account, neither ranking nor GP are effective methods to find the optimum timetable. This paper develops a genetic algorithm (GA) to address this problem. The GA uses the ranking vector of the projects as a GA individual and then transforms it into a project proportion matrix by imposing the budget constraint. Experiments show that the GA can find the optimum solution with an acceptable accuracy, and when the projects are differentiated between Type 1 and 2, the GA finds the optimum timetable that is different from that in the case of all Type 1 projects.
引用
收藏
页码:569 / 574
页数:6
相关论文
共 50 条
  • [41] The Application of Genetic Algorithm in Task Scheduling
    Chen, Xiaoyan
    Zhang, Kun
    Li, Zhuang
    Wang, Haifeng
    2015 INTERNATIONAL CONFERENCE ON NETWORK AND INFORMATION SYSTEMS FOR COMPUTERS (ICNISC), 2015, : 332 - 334
  • [42] A Genetic Algorithm Solution for Scheduling Problem
    Cortes Perez, Ernesto
    Montero Rios, Osiris
    Pacheco Bautista, Daniel
    Sanchez Sanchez, Sergio
    Aguilar Acevedo, Francisco
    2021 XVII INTERNATIONAL ENGINEERING CONGRESS (CONIIN), 2021,
  • [43] Genetic algorithm for logistics scheduling problem
    Wen, C
    Eberhart, RC
    CEC'02: PROCEEDINGS OF THE 2002 CONGRESS ON EVOLUTIONARY COMPUTATION, VOLS 1 AND 2, 2002, : 512 - 516
  • [44] Adaptive genetic algorithm for multiprocessor scheduling
    Zahran, MM
    Wahab, AHA
    Shaheen, SI
    GECCO-99: PROCEEDINGS OF THE GENETIC AND EVOLUTIONARY COMPUTATION CONFERENCE, 1999, : 814 - 814
  • [45] An Improved Genetic Algorithm on Task Scheduling
    Zheng, Fangyuan
    Li, Jingmei
    ADVANCED HYBRID INFORMATION PROCESSING, 2018, 219 : 497 - 500
  • [46] A GENETIC ALGORITHM FOR THE TALENT SCHEDULING PROBLEM
    NORDSTROM, AL
    TUFEKCI, S
    COMPUTERS & OPERATIONS RESEARCH, 1994, 21 (08) : 927 - 940
  • [47] Aided genetic algorithm for multiprocessor scheduling
    Vaidehi, V.
    Krishnan, C.N.
    Swaminathan, P.
    Parallel Processing Letters, 1999, 9 (03): : 423 - 436
  • [48] A genetic algorithm approach to system scheduling
    Todd, DS
    Scott, JA
    Sen, P
    LARGE SCALE SYSTEMS: THEORY AND APPLICATIONS 1998 (LSS'98), VOL 1, 1999, : 277 - 282
  • [49] Project Scheduling Based on Genetic Algorithm
    Ma, Ji
    2009 IEEE INTERNATIONAL CONFERENCE ON GRANULAR COMPUTING ( GRC 2009), 2009, : 434 - 439
  • [50] A genetic algorithm for erection scheduling at a dock
    Xu, Ai-Min
    Jin, Ye
    Journal of Ship Production, 2007, 23 (01): : 17 - 22