Prioritising and scheduling road projects by genetic algorithm

被引:7
|
作者
Qiu, M
机构
关键词
D O I
10.1016/S0378-4754(97)82761-9
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The optimum timetable for implementing a set of road projects so as to achieve maximum investment effectiveness can be found by ranking or Goal Programming (GP) under the assumption that the payoffs of all the projects are divisible and proportional to their proportions undertaken. This assumption is valid for upgrading projects (Type I) but not for new ones (Type 2). When this difference is taken into account, neither ranking nor GP are effective methods to find the optimum timetable. This paper develops a genetic algorithm (GA) to address this problem. The GA uses the ranking vector of the projects as a GA individual and then transforms it into a project proportion matrix by imposing the budget constraint. Experiments show that the GA can find the optimum solution with an acceptable accuracy, and when the projects are differentiated between Type 1 and 2, the GA finds the optimum timetable that is different from that in the case of all Type 1 projects.
引用
收藏
页码:569 / 574
页数:6
相关论文
共 50 条
  • [31] Road traffic injury: Prioritising interventions
    Matzopoulos, R.
    Myers, J. E.
    Jobanputra, R.
    SAMJ SOUTH AFRICAN MEDICAL JOURNAL, 2008, 98 (09): : 692 - 696
  • [32] Use of genetic algorithms in resource scheduling of construction projects
    Senouci, AB
    Eldin, NN
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2004, 130 (06): : 869 - 877
  • [33] Composite random sampling algorithm for scheduling concurrent projects
    Shou, Yong-Yi
    Zhejiang Daxue Xuebao (Gongxue Ban)/Journal of Zhejiang University (Engineering Science), 2006, 40 (02): : 344 - 347
  • [34] A Tabu Search Algorithm for Simultaneous Selection and Scheduling of Projects
    Kumar, Manish
    Mittal, M. L.
    Soni, Gunjan
    Joshi, Dheeraj
    HARMONY SEARCH AND NATURE INSPIRED OPTIMIZATION ALGORITHMS, 2019, 741 : 1111 - 1121
  • [35] Prioritising job creation without undermining public works construction among road improvement projects in rural Nicaragua
    Garz, Seth
    Perova, Elizaveta
    JOURNAL OF DEVELOPMENT EFFECTIVENESS, 2021, 13 (02) : 224 - 245
  • [36] Genetic algorithm constraint project scheduling
    Research and Decision Support System Dept., Faculty of Computers and Informatics, Zagazig University, Zagazig, Egypt
    不详
    AEJ Alexandria Eng J, 2006, 3 (289-298):
  • [37] Genetic algorithm for scheduling aircraft landing
    Baccouche, M
    Boukachour, J
    Benabdelhafid, A
    1st International Industrial Simulation Conference 2003, 2003, : 418 - 422
  • [38] A fuzzy genetic algorithm for driver scheduling
    Li, JP
    Kwan, RSK
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2003, 147 (02) : 334 - 344
  • [39] PROGENITOR - A GENETIC ALGORITHM FOR PRODUCTION SCHEDULING
    KANET, JJ
    SRIDHARAN, V
    WIRTSCHAFTSINFORMATIK, 1991, 33 (04): : 332 - 336
  • [40] PROGENITOR - A GENETIC ALGORITHM FOR PRODUCTION SCHEDULING
    KOPFER, H
    WIRTSCHAFTSINFORMATIK, 1992, 34 (02): : 255 - 256