共 50 条
- [3] Project Scheduling Based on Genetic Algorithm [J]. 2009 IEEE INTERNATIONAL CONFERENCE ON GRANULAR COMPUTING ( GRC 2009), 2009, : 434 - 439
- [4] Application of Forest Optimization Algorithm for the Resource Constraint Project Scheduling [J]. INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS, 2022, 21 (02): : 313 - 321
- [5] A New Hybrid Algorithm for the Resource Constraint Project Scheduling Problem [J]. INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS, 2022, 21 (03): : 492 - 502
- [7] Project scheduling using a competitive genetic algorithm [J]. SMO 08: PROCEEDINGS OF THE 8TH WSEAS INTERNATIONAL CONFERENCE ON SIMULATION, MODELLING AND OPTIMIZATION, 2008, : 39 - +
- [8] Project Scheduling with Multiple Modes: A Genetic Algorithm [J]. Annals of Operations Research, 2001, 102 : 111 - 135
- [9] New genetic algorithm for parallel machine scheduling with process constraint [J]. Tien Tzu Hsueh Pao/Acta Electronica Sinica, 2001, 29 (11): : 1482 - 1485
- [10] Combining Constraint Programming and Genetic Algorithm for Dynamic Scheduling Problems [J]. 2017 INTERNATIONAL COLLOQUIUM ON LOGISTICS AND SUPPLY CHAIN MANAGEMENT (LOGISTIQUA), 2017, : 19 - 24