共 50 条
- [23] A hybrid genetic algorithm based on intelligent encoding for project scheduling [J]. IMECS 2007: INTERNATIONAL MULTICONFERENCE OF ENGINEERS AND COMPUTER SCIENTISTS, VOLS I AND II, 2007, : 2264 - +
- [24] A Genetic Hyperheuristic Algorithm for the Resource Constrained Project Scheduling Problem [J]. 2010 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2010,
- [25] Multi-project scheduling using an heuristic and a genetic algorithm [J]. International Journal of Advanced Manufacturing Technology, 2006, 31 (3-4): : 360 - 366
- [26] Concurrent Project Scheduling and Material Planning: A Genetic Algorithm Approach [J]. SCIENTIA IRANICA TRANSACTION E-INDUSTRIAL ENGINEERING, 2009, 16 (02): : 91 - 99
- [27] Genetic Algorithm for the Project Scheduling Problem with Fuzzy Time Parameters [J]. 2011 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2011, : 689 - 693
- [28] An improved quantum genetic algorithm for the Resource Constrained Project Scheduling [J]. PROCEEDINGS OF THE 2016 4TH INTERNATIONAL CONFERENCE ON ELECTRICAL & ELECTRONICS ENGINEERING AND COMPUTER SCIENCE (ICEEECS 2016), 2016, 50 : 612 - 617
- [29] Resource Constrained Project Scheduling of Construction Engineering with Genetic Algorithm [J]. 2008 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-11, 2008, : 1466 - 1470
- [30] Multi-project scheduling using an heuristic and a genetic algorithm [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2006, 31 (3-4): : 360 - 366