Production based scheduling method for linear construction in road projects

被引:0
|
作者
S. R. Kannan
R. Senthil
机构
[1] Easwari Engineering College,Dept. of Civil Engineering
[2] Anna University,Dept. of Civil Engineering
来源
关键词
scheduling; productivity; linear activities; road projects; delphi;
D O I
暂无
中图分类号
学科分类号
摘要
Scheduling of road projects has always been a challenging endeavor in the construction industry as project durations are quite often unpredictable. It depends on the production rates of individual activities which are governed by factors such as availability of resources, environmental and geographical conditions. The current trend in road project scheduling is based on productivity of a certain item of work with a defined crew as resource. Practically, as these production rates are not achieved as per plan, an attempt has been made in this work to propose a simple model to estimate road project durations utilizing probable production rates of activities. A simulation model attempted to arrive at probable production rates of these activities has indicated a wide range of values that cannot lead to accurate time estimates. A more specific range of production rate estimates have been arrived adopting Delphi process to account for factors mainly within the purview of constructors. The basic framework for time estimates has been proposed by adopting Linear Scheduling Method (LSM) for scheduling due to limitations of network techniques in road works. A simple flowchart model of the time estimate method has been presented incorporating probable production rates defining crews and buffer distances.
引用
收藏
页码:1292 / 1301
页数:9
相关论文
共 50 条
  • [1] Production based scheduling method for linear construction in road projects
    Kannan, S. R.
    Senthil, R.
    KSCE JOURNAL OF CIVIL ENGINEERING, 2014, 18 (05) : 1292 - 1301
  • [2] Production rate determination for linear construction projects based on linear scheduling method
    Liu L.
    Liu Y.
    Tang Y.
    Int. J. Smart Home, 4 (143-152): : 143 - 152
  • [3] A study on linear scheduling methods in road construction projects
    Yogesh, G.
    Rao, Ch Hanumanth
    MATERIALS TODAY-PROCEEDINGS, 2021, 47 : 5475 - 5478
  • [4] A procedure for critical path method-based scheduling in linear construction projects
    Okmen, O.
    JOURNAL OF THE SOUTH AFRICAN INSTITUTION OF CIVIL ENGINEERING, 2013, 55 (02) : 12 - 20
  • [5] A procedure for critical path method-based scheduling in linear construction projects
    Ökmen, Ö. (onderokmen@hotmail.com), 1600, South African Institute of Civil Engineers (55):
  • [6] Advanced linear scheduling program with varying production rates for pipeline construction projects
    Duffy, Greg
    Woldesenbet, Asregedew
    Jeong, David Hyung Seok
    Oberlender, Garold D.
    AUTOMATION IN CONSTRUCTION, 2012, 27 : 99 - 110
  • [7] Fuzzy Linear and Repetitive Scheduling for Construction Projects
    Katsuragawa, Clara Mariana
    Lucko, Gunnar
    Isaac, Shabtai
    Su, Yi
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2021, 147 (03)
  • [8] A new approach for automation of location-based earthwork scheduling in road construction projects
    Shah, Raj Kapur
    AUTOMATION IN CONSTRUCTION, 2014, 43 : 156 - 169
  • [9] Segmentation and Repetitive Scheduling of Linear Continuous Construction Projects
    Moos, Michael
    Velten, Sebastian
    Weiss, Christian
    OPERATIONS RESEARCH PROCEEDINGS 2021, 2022, : 134 - 140
  • [10] A genetic algorithm-based method for scheduling repetitive construction projects
    Long, Luong Duc
    Ohsato, Ario
    AUTOMATION IN CONSTRUCTION, 2009, 18 (04) : 499 - 511