A study on linear scheduling methods in road construction projects

被引:4
|
作者
Yogesh, G. [1 ]
Rao, Ch Hanumanth [1 ]
机构
[1] Deemed Univ, Koneru Lakshmaiah Educ Fdn, Dept Civil Engn, Guntur 522502, Andhra Pradesh, India
关键词
Scheduling; Pavement; Construction; Highway; Planning;
D O I
10.1016/j.matpr.2021.07.393
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Construction industry plays a major role in the economic development of a Nation. Trade and commerce in any country have always depended on the construction industry to deliver the infrastructure facilities promptly. In the construction of National highway No: 65, a crucial observation is made. There had been certain strategies utilised in the process of starting the project, in which I had a keen observation and been listed in their potential domains. In the construction of National No: 65, a crucial observation is made. There had been certain strategies utilised in the process of starting the project, Because of the nature of the link between its activities and execution style, these approaches have been shown to be insufficient for scheduling projects such as motorways. These are known as linear projects, and they generally consist of activities that cover the whole project's duration, with subsequent activities progressing at the same time while preserving a buffer time and distance between them. (c) 2021 Elsevier Ltd. All rights reserved. Selection and peer-review under responsibility of the International Conference on Sustainable materials, Manufacturing and Renewable Technologies 2021.
引用
收藏
页码:5475 / 5478
页数:4
相关论文
共 50 条
  • [1] Production based scheduling method for linear construction in road projects
    Kannan, S. R.
    Senthil, R.
    KSCE JOURNAL OF CIVIL ENGINEERING, 2014, 18 (05) : 1292 - 1301
  • [2] Production based scheduling method for linear construction in road projects
    S. R. Kannan
    R. Senthil
    KSCE Journal of Civil Engineering, 2014, 18 : 1292 - 1301
  • [3] Fuzzy Linear and Repetitive Scheduling for Construction Projects
    Katsuragawa, Clara Mariana
    Lucko, Gunnar
    Isaac, Shabtai
    Su, Yi
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2021, 147 (03)
  • [4] Segmentation and Repetitive Scheduling of Linear Continuous Construction Projects
    Moos, Michael
    Velten, Sebastian
    Weiss, Christian
    OPERATIONS RESEARCH PROCEEDINGS 2021, 2022, : 134 - 140
  • [5] Linear Scheduling Optimization Model for Planning Repetitive Construction Projects
    Monghasemi, Shahryar
    Abdallah, Moatassem
    Clevenger, Caroline
    CONSTRUCTION RESEARCH CONGRESS 2020: PROJECT MANAGEMENT AND CONTROLS, MATERIALS, AND CONTRACTS, 2020, : 1129 - 1138
  • [6] Production rate determination for linear construction projects based on linear scheduling method
    Liu L.
    Liu Y.
    Tang Y.
    Int. J. Smart Home, 4 (143-152): : 143 - 152
  • [7] Scheduling of Construction Projects
    Bozejko, Wojciech
    Wodecki, Mieczyslaw
    PROCEEDINGS OF THE 6TH EUROPEAN CONFERENCE ON MANAGEMENT LEADERSHIP AND GOVERNANCE, 2010, : 64 - 72
  • [8] Linear Optimization Model for Scheduling Repetitive Construction Projects with Multiple Crews
    Monghasemi, Shahryar
    Abdallah, Moatassem
    CONSTRUCTION RESEARCH CONGRESS 2022: PROJECT MANAGEMENT AND DELIVERY, CONTRACTS, AND DESIGN AND MATERIALS, 2022, : 461 - 471
  • [9] A multi-objective integrated model for selecting, scheduling, and budgeting road construction projects
    Hosseininasab, Seyyed-Mohammadreza
    Shetab-Boushehri, Seyyed-Nader
    Hejazi, Seyed Reza
    Karimi, Hadi
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2018, 271 (01) : 262 - 277
  • [10] Network-level scheduling of road construction projects considering user and business impacts
    Miralinaghi, Mohammad
    Woldemariam, Wubeshet
    Abraham, Dulcy M.
    Chen, Sikai
    Labi, Samuel
    Chen, Zhibin
    COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING, 2020, 35 (07) : 650 - 667