A study on linear scheduling methods in road construction projects

被引:4
|
作者
Yogesh, G. [1 ]
Rao, Ch Hanumanth [1 ]
机构
[1] Deemed Univ, Koneru Lakshmaiah Educ Fdn, Dept Civil Engn, Guntur 522502, Andhra Pradesh, India
关键词
Scheduling; Pavement; Construction; Highway; Planning;
D O I
10.1016/j.matpr.2021.07.393
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Construction industry plays a major role in the economic development of a Nation. Trade and commerce in any country have always depended on the construction industry to deliver the infrastructure facilities promptly. In the construction of National highway No: 65, a crucial observation is made. There had been certain strategies utilised in the process of starting the project, in which I had a keen observation and been listed in their potential domains. In the construction of National No: 65, a crucial observation is made. There had been certain strategies utilised in the process of starting the project, Because of the nature of the link between its activities and execution style, these approaches have been shown to be insufficient for scheduling projects such as motorways. These are known as linear projects, and they generally consist of activities that cover the whole project's duration, with subsequent activities progressing at the same time while preserving a buffer time and distance between them. (c) 2021 Elsevier Ltd. All rights reserved. Selection and peer-review under responsibility of the International Conference on Sustainable materials, Manufacturing and Renewable Technologies 2021.
引用
收藏
页码:5475 / 5478
页数:4
相关论文
共 50 条
  • [31] Genetic algorithm-based multi-objective model for scheduling of linear construction projects
    Senouci, Ahmed
    Al-Derham, Hassan R.
    ADVANCES IN ENGINEERING SOFTWARE, 2008, 39 (12) : 1023 - 1028
  • [32] Application of Relationship Diagramming Method (RDM) for resource-constrained scheduling of linear construction projects
    Maheswari, J. Uma
    Charlesraj, V. Paul C.
    Goyal, Anshul
    Mujumdar, Purva
    CREATIVE CONSTRUCTION CONFERENCE 2015, SELECTED PAPERS, 2015, 123 : 308 - 315
  • [33] Causes of Delay in Road Construction Projects in Afghanistan
    Kivrak, Serkan
    Baha, Mohammad Yonis
    JOURNAL OF SCIENTIFIC & INDUSTRIAL RESEARCH, 2024, 83 (01): : 46 - 57
  • [34] Preliminary Cost Estimating for Road Construction Projects
    Mahamid, Ibrahim
    Bruland, Amund
    PROCEEDINGS OF 2010 INTERNATIONAL CONFERENCE ON CONSTRUCTION AND REAL ESTATE MANAGEMENT, VOLS 1-3, 2010, : 158 - 161
  • [35] THE APPRAISAL OF ROAD CONSTRUCTION PROJECTS - A PRACTICAL EXAMPLE
    BOS, HC
    KOYCK, LM
    REVIEW OF ECONOMICS AND STATISTICS, 1961, 43 (01) : 13 - 20
  • [36] LOGISTICS OPTIMIZATION IN ROAD CONSTRUCTION PROJECTS OF PAKISTAN
    Shah, Kiran
    Abbasi, Sara Siraj
    Zia, Muhammad Muawwiz
    Khan, Imran Sarvar
    Shah, Syed Asim Ali
    5TH INTERNATIONAL CONFERENCE ON ADVANCES IN EDUCATION AND SOCIAL SCIENCE (ADVED 2019), 2019, : 801 - 804
  • [37] Causes of delay in road construction projects in Malawi
    Kamanga, M. J.
    Steyn, W. J. von der M.
    JOURNAL OF THE SOUTH AFRICAN INSTITUTION OF CIVIL ENGINEERING, 2013, 55 (03) : 79 - 85
  • [38] CONSTRUCTION PROJECTS SCHEDULING USING GIS TOOLS
    Bansal, V. K.
    Pal, Mahesh
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2011, 11 (01) : 1 - 18
  • [39] Dynamic Spatiotemporal Scheduling for Construction Building Projects
    Morin-Pepin, Stephane
    Francis, Adel
    BUILDINGS, 2024, 14 (10)
  • [40] Resilient Scheduling as a Response to Uncertainty in Construction Projects
    Milat, Martina
    Knezic, Snjezana
    Sedlar, Jelena
    APPLIED SCIENCES-BASEL, 2021, 11 (14):