A study on linear scheduling methods in road construction projects

被引:4
|
作者
Yogesh, G. [1 ]
Rao, Ch Hanumanth [1 ]
机构
[1] Deemed Univ, Koneru Lakshmaiah Educ Fdn, Dept Civil Engn, Guntur 522502, Andhra Pradesh, India
关键词
Scheduling; Pavement; Construction; Highway; Planning;
D O I
10.1016/j.matpr.2021.07.393
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Construction industry plays a major role in the economic development of a Nation. Trade and commerce in any country have always depended on the construction industry to deliver the infrastructure facilities promptly. In the construction of National highway No: 65, a crucial observation is made. There had been certain strategies utilised in the process of starting the project, in which I had a keen observation and been listed in their potential domains. In the construction of National No: 65, a crucial observation is made. There had been certain strategies utilised in the process of starting the project, Because of the nature of the link between its activities and execution style, these approaches have been shown to be insufficient for scheduling projects such as motorways. These are known as linear projects, and they generally consist of activities that cover the whole project's duration, with subsequent activities progressing at the same time while preserving a buffer time and distance between them. (c) 2021 Elsevier Ltd. All rights reserved. Selection and peer-review under responsibility of the International Conference on Sustainable materials, Manufacturing and Renewable Technologies 2021.
引用
收藏
页码:5475 / 5478
页数:4
相关论文
共 50 条
  • [21] Causes of Delay in Road Construction Projects
    Mahamid, Ibrahim
    Bruland, Amund
    Dmaidi, Nabil
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2012, 28 (03) : 300 - 310
  • [22] Least - cost scheduling of Construction Projects
    Faheem, Miriqbal
    Basha, Syed Saleem
    Kalam, M.A.
    International Journal of Earth Sciences and Engineering, 2010, 3 (05): : 753 - 761
  • [24] CONSTRUCTION PLANNING FOR LINEAR PROJECTS
    SELINGER, S
    JOURNAL OF THE CONSTRUCTION DIVISION-ASCE, 1980, 106 (02): : 195 - 205
  • [25] CONSTRUCTION PLANNING FOR LINEAR PROJECTS
    Selinger, Shlomo
    American Society of Civil Engineers, Journal of the Construction Division, 1980, 106 (02): : 195 - 205
  • [26] Prediction Equation Study of Road and Regolith Erosion in Production and Construction Projects
    Yan, Nan
    Qin, Wei
    Zuo, Changqing
    Yin, Zhe
    Li, Bai
    Guo, Qiankun
    Shan, Zhijie
    Wang, Zhaoyan
    PROCEEDINGS OF THE 2015 INTERNATIONAL FORUM ON ENERGY, ENVIRONMENT SCIENCE AND MATERIALS, 2015, 40 : 846 - 853
  • [27] Effects of toll road construction on local road projects in Indonesia
    Andani, I. G. Ayu
    Puello, Lissy La Paix
    Geurs, Karst
    JOURNAL OF TRANSPORT AND LAND USE, 2019, 12 (01) : 179 - 199
  • [28] EVALUATION METHODS FOR CONSTRUCTION PROJECTS
    Park, Moonseo
    Chu, Yongsik
    Lee, Hyun-Soo
    Kim, Wooyoung
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2009, 15 (04) : 349 - 359
  • [29] METHODS OF EVALUATING ALTERNATIVE ROAD PROJECTS
    WOHL, M
    MARTIN, BV
    JOURNAL OF TRANSPORT ECONOMICS AND POLICY, 1967, 1 (01) : 28 - 45
  • [30] Causes of claims in road construction projects in the UAE
    Mishmish, Malek
    El-Sayegh, Sameh M.
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2018, 18 (01) : 26 - 33