Linear Scheduling Optimization Model for Planning Repetitive Construction Projects

被引:0
|
作者
Monghasemi, Shahryar [1 ]
Abdallah, Moatassem [1 ]
Clevenger, Caroline [2 ]
机构
[1] Univ Colorado, Dept Civil Engn, Denver, CO 80202 USA
[2] Univ Colorado, Dept Civil Engn, Construct Engn & Management, Denver, CO 80202 USA
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Scheduling of repetitive construction projects is more complex and challenging due to large number of decision variables, constraints, and tradeoffs between time and cost. Traditional time-driven scheduling techniques such as critical path method (CPM) are inefficient in scheduling repetitive construction projects since they do not maintain crew work continuity. The present study focuses on developing an exact linear optimization model for scheduling repetitive construction projects with multiple crews and multiple options of construction methods for each activity. The optimization model is developed in three steps: (1) identifying decision variables; (2) formulating objective function and constraints; and (3) implementing model computations. Decision variables are identified to model start time of each activity at each unit, number of crews, idle time of crews, and construction methods. The objective function is designed to minimize the project total cost including the direct cost of activities, cost of additional crews for activities, and idle cost of crews during the entire project. Additionally, several constraints are integrated in the model to ensure practicality of the identified solution. Finally, the model computations are executed using the problem-based optimization modeling of MATLAB 2019a and mixed integer linear programming (MILP) solver in Gurobi. The performance of the developed model and its capabilities were tested on a case study of 100 repetitive units with nine activities to complete each unit. The optimization model identified the optimal schedule of the project while complying with specified duration. The results show the developed optimization model is capable of identifying optimal schedule of repetitive projects that can lead to minimum project cost while maintaining crew work continuity.
引用
收藏
页码:1129 / 1138
页数:10
相关论文
共 50 条
  • [1] Linear Optimization Model for Scheduling Repetitive Construction Projects with Multiple Crews
    Monghasemi, Shahryar
    Abdallah, Moatassem
    [J]. CONSTRUCTION RESEARCH CONGRESS 2022: PROJECT MANAGEMENT AND DELIVERY, CONTRACTS, AND DESIGN AND MATERIALS, 2022, : 461 - 471
  • [2] Multipurpose linear programming optimization model for repetitive activities scheduling in construction projects
    Diego Garcia-Nieves, Juan
    Luis Ponz-Tienda, Jose
    Ospina-Alvarado, Angelica
    Bonilla-Palacios, Mateo
    [J]. AUTOMATION IN CONSTRUCTION, 2019, 105
  • [3] Multiobjective Optimization Model for Planning Repetitive Construction Projects
    Altuwaim, Ayman
    El-Rayes, Khaled
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2021, 147 (07)
  • [4] Optimal planning and scheduling for repetitive construction projects
    Hyari, K
    El-Rayes, K
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2006, 22 (01) : 11 - 19
  • [5] Fuzzy Linear and Repetitive Scheduling for Construction Projects
    Katsuragawa, Clara Mariana
    Lucko, Gunnar
    Isaac, Shabtai
    Su, Yi
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2021, 147 (03)
  • [6] Segmentation and Repetitive Scheduling of Linear Continuous Construction Projects
    Moos, Michael
    Velten, Sebastian
    Weiss, Christian
    [J]. OPERATIONS RESEARCH PROCEEDINGS 2021, 2022, : 134 - 140
  • [7] Multiobjective linear programming model for scheduling linear repetitive projects
    Ipsilandis, Pandelis G.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2007, 133 (06) : 417 - 424
  • [8] Non-unit-based planning and scheduling of repetitive construction projects
    Huang, Rong-Yau
    Sun, Kuo-Shun
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2006, 132 (06) : 585 - 597
  • [9] Scheduling optimization model for linear projects with resource transfer in diverse construction scenarios
    Zhao, Xuan
    Zhou, Guohua
    [J]. ENGINEERING OPTIMIZATION, 2024,
  • [10] SCHEDULING OF REPETITIVE PROJECTS WITH COST OPTIMIZATION
    MOSELHI, O
    ELRAYES, K
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1993, 119 (04): : 681 - 697