Linear Scheduling Optimization Model for Planning Repetitive Construction Projects

被引:0
|
作者
Monghasemi, Shahryar [1 ]
Abdallah, Moatassem [1 ]
Clevenger, Caroline [2 ]
机构
[1] Univ Colorado, Dept Civil Engn, Denver, CO 80202 USA
[2] Univ Colorado, Dept Civil Engn, Construct Engn & Management, Denver, CO 80202 USA
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Scheduling of repetitive construction projects is more complex and challenging due to large number of decision variables, constraints, and tradeoffs between time and cost. Traditional time-driven scheduling techniques such as critical path method (CPM) are inefficient in scheduling repetitive construction projects since they do not maintain crew work continuity. The present study focuses on developing an exact linear optimization model for scheduling repetitive construction projects with multiple crews and multiple options of construction methods for each activity. The optimization model is developed in three steps: (1) identifying decision variables; (2) formulating objective function and constraints; and (3) implementing model computations. Decision variables are identified to model start time of each activity at each unit, number of crews, idle time of crews, and construction methods. The objective function is designed to minimize the project total cost including the direct cost of activities, cost of additional crews for activities, and idle cost of crews during the entire project. Additionally, several constraints are integrated in the model to ensure practicality of the identified solution. Finally, the model computations are executed using the problem-based optimization modeling of MATLAB 2019a and mixed integer linear programming (MILP) solver in Gurobi. The performance of the developed model and its capabilities were tested on a case study of 100 repetitive units with nine activities to complete each unit. The optimization model identified the optimal schedule of the project while complying with specified duration. The results show the developed optimization model is capable of identifying optimal schedule of repetitive projects that can lead to minimum project cost while maintaining crew work continuity.
引用
收藏
页码:1129 / 1138
页数:10
相关论文
共 50 条
  • [31] Collaborative supply chain planning and scheduling of construction projects
    Elmughrabi, Walid
    Ben Sassi, Oumaima
    Dao, Thien-My
    Chabaane, Amin
    [J]. IFAC PAPERSONLINE, 2020, 53 (02): : 10761 - 10766
  • [32] A genetic algorithm-based method for scheduling repetitive construction projects
    Long, Luong Duc
    Ohsato, Ario
    [J]. AUTOMATION IN CONSTRUCTION, 2009, 18 (04) : 499 - 511
  • [33] Optimizing the scheduling of crew deployments in repetitive construction projects under uncertainty
    Hassan, Abbas
    El-Rayes, Khaled
    Attalla, Mohamed
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2021, 28 (06) : 1615 - 1634
  • [34] DEVELOPING A MATHEMATICAL MODEL FOR PLANNING REPETITIVE CONSTRUCTION PROJECTS BY USING SUPPORT VECTOR MACHINE TECHNIQUE
    Burhan, Abbas M.
    Erzaij, Kadhim Raheim
    Hatem, Wadhah Amer
    [J]. CIVIL AND ENVIRONMENTAL ENGINEERING, 2021, 17 (02) : 371 - 379
  • [35] A study on linear scheduling methods in road construction projects
    Yogesh, G.
    Rao, Ch Hanumanth
    [J]. MATERIALS TODAY-PROCEEDINGS, 2021, 47 : 5475 - 5478
  • [36] APPLICATION OF LINEAR PROGRAMMING TO CONSTRUCTION PLANNING AND SCHEDULING
    不详
    [J]. AUSTRALIAN CIVIL ENGINEERING, 1969, 10 (12): : 24 - &
  • [37] Optimization of Stochastic Repetitive Construction Projects: Minimizing Duration Uncertainties
    Abosamra, Hussein
    ElSayad, Mohamed A.
    Eid, Mohamed S.
    Elhakeem, Ahmed
    [J]. COMPUTING IN CIVIL ENGINEERING 2023-VISUALIZATION, INFORMATION MODELING, AND SIMULATION, 2024, : 180 - 188
  • [38] SIMULATION AND OPTIMIZATION FOR CONSTRUCTION REPETITIVE PROJECTS USING PROMODEL AND SIMRUNNER
    Srisuwanrat, Chachrist
    Ioannou, Photios G.
    Tsimhoni, Omer
    [J]. 2008 WINTER SIMULATION CONFERENCE, VOLS 1-5, 2008, : 2402 - +
  • [39] Scheduling Optimization of Prefabricated Construction Projects by Genetic Algorithm
    Xie, Linlin
    Chen, Yajiao
    Chang, Ruidong
    [J]. APPLIED SCIENCES-BASEL, 2021, 11 (12):
  • [40] REPNET: project scheduling and workflow optimization for Construction Projects
    Bragadin, Marco Alvise
    Kahkonen, Kalle
    [J]. IN BO-RICERCHE E PROGETTI PER IL TERRITORIO LA CITTA E L ARCHITETTURA, 2013, 4 (02): : 9 - 20