Optimal planning and scheduling for repetitive construction projects

被引:122
|
作者
Hyari, K [1 ]
El-Rayes, K
机构
[1] Univ Illinois, Dept Civil & Environm Engn, Urbana, IL 61801 USA
[2] Hashemite Univ, Dept Civil Engn, Zarqa 13115, Jordan
关键词
road construction; highway construction; scheduling; resource management; optimization; evolutionary computation; computer models; construction management;
D O I
10.1061/(ASCE)0742-597X(2006)22:1(11)
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper presents a multiobjective optimization model for the planning and scheduling of repetitive construction projects. The model enables construction planners to generate and evaluate optimal construction plans that minimize project duration and maximize crew work continuity, simultaneously. The computations in the present model are organized in three major modules: scheduling, optimization, and ranking modules. First, the scheduling module uses a resource-driven scheduling algorithm to develop practical schedules for repetitive construction projects. Second, the optimization module utilizes multiobjective genetic algorithms to search for and identify feasible construction plans that establish optimal tradeoffs between project duration and crew work continuity. Third, the ranking module uses multiattribute utility theory to rank the generated plans in order to facilitate the selection and execution of the best overall plan for the project being considered. An application example is analyzed to illustrate the use of the model demonstrate its new capabilities in optimizing the planning and scheduling of repetitive construction projects.
引用
收藏
页码:11 / 19
页数:9
相关论文
共 50 条
  • [1] Linear Scheduling Optimization Model for Planning Repetitive Construction Projects
    Monghasemi, Shahryar
    Abdallah, Moatassem
    Clevenger, Caroline
    CONSTRUCTION RESEARCH CONGRESS 2020: PROJECT MANAGEMENT AND CONTROLS, MATERIALS, AND CONTRACTS, 2020, : 1129 - 1138
  • [2] Non-unit-based planning and scheduling of repetitive construction projects
    Huang, Rong-Yau
    Sun, Kuo-Shun
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2006, 132 (06) : 585 - 597
  • [3] Fuzzy Linear and Repetitive Scheduling for Construction Projects
    Katsuragawa, Clara Mariana
    Lucko, Gunnar
    Isaac, Shabtai
    Su, Yi
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2021, 147 (03)
  • [4] A Fixed Start Scheduling Approach for Repetitive Construction Projects
    Francisco Moreno
    Francisco Orozco
    Omar Rojas
    Bolivar Senior
    Mani Poshdar
    Eric Forcael
    KSCE Journal of Civil Engineering, 2020, 24 : 1671 - 1682
  • [5] SCHEDULING REPETITIVE CONSTRUCTION PROJECTS: STRUCTURED LITERATURE REVIEW
    Tomczak, Michal
    Jaskowski, Piotr
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2022, 28 (06) : 422 - 442
  • [6] Segmentation and Repetitive Scheduling of Linear Continuous Construction Projects
    Moos, Michael
    Velten, Sebastian
    Weiss, Christian
    OPERATIONS RESEARCH PROCEEDINGS 2021, 2022, : 134 - 140
  • [7] A Fixed Start Scheduling Approach for Repetitive Construction Projects
    Moreno, Francisco
    Orozco, Francisco
    Rojas, Omar
    Senior, Bolivar
    Poshdar, Mani
    Forcael, Eric
    KSCE JOURNAL OF CIVIL ENGINEERING, 2020, 24 (6) : 1671 - 1682
  • [8] Multiobjective Optimization Model for Planning Repetitive Construction Projects
    Altuwaim, Ayman
    El-Rayes, Khaled
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2021, 147 (07)
  • [9] Planning repetitive construction projects considering technological constraints
    Radziszewska-Zielina, Elzbieta
    Sroka, Bartlomiej
    OPEN ENGINEERING, 2018, 8 (01): : 500 - 505
  • [10] Optimized scheduling and buffering of repetitive construction projects under uncertainty
    Bakry, Ibrahim
    Moselhi, Osama
    Zayed, Tarek
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2016, 23 (06) : 782 - 800