Optimal planning and scheduling for repetitive construction projects

被引:122
|
作者
Hyari, K [1 ]
El-Rayes, K
机构
[1] Univ Illinois, Dept Civil & Environm Engn, Urbana, IL 61801 USA
[2] Hashemite Univ, Dept Civil Engn, Zarqa 13115, Jordan
关键词
road construction; highway construction; scheduling; resource management; optimization; evolutionary computation; computer models; construction management;
D O I
10.1061/(ASCE)0742-597X(2006)22:1(11)
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper presents a multiobjective optimization model for the planning and scheduling of repetitive construction projects. The model enables construction planners to generate and evaluate optimal construction plans that minimize project duration and maximize crew work continuity, simultaneously. The computations in the present model are organized in three major modules: scheduling, optimization, and ranking modules. First, the scheduling module uses a resource-driven scheduling algorithm to develop practical schedules for repetitive construction projects. Second, the optimization module utilizes multiobjective genetic algorithms to search for and identify feasible construction plans that establish optimal tradeoffs between project duration and crew work continuity. Third, the ranking module uses multiattribute utility theory to rank the generated plans in order to facilitate the selection and execution of the best overall plan for the project being considered. An application example is analyzed to illustrate the use of the model demonstrate its new capabilities in optimizing the planning and scheduling of repetitive construction projects.
引用
收藏
页码:11 / 19
页数:9
相关论文
共 50 条
  • [21] OPTIMAL LABOR SCHEDULING FOR CONSTRUCTION PROJECTS IN THE MIDDLE-EAST
    TANG, JCS
    LIAO, WC
    ANNALS OF REGIONAL SCIENCE, 1984, 18 (01): : 51 - 56
  • [22] Optimal scheduling of probabilistic repetitive projects using completed unit and genetic algorithms
    Srisuwanrat, Chachrist
    Ioannou, Photios G.
    PROCEEDINGS OF THE 2007 WINTER SIMULATION CONFERENCE, VOLS 1-5, 2007, : 2130 - 2137
  • [23] Enhanced planning and scheduling in building construction projects: an innovative approach to overcome scheduling challenges
    Amarkhil, Qais
    Elwakil, Emad
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024, 24 (16) : 1719 - 1729
  • [24] Scheduling of Construction Projects
    Bozejko, Wojciech
    Wodecki, Mieczyslaw
    PROCEEDINGS OF THE 6TH EUROPEAN CONFERENCE ON MANAGEMENT LEADERSHIP AND GOVERNANCE, 2010, : 64 - 72
  • [25] SCHEDULING OF REPETITIVE PROJECTS WITH COST OPTIMIZATION
    MOSELHI, O
    ELRAYES, K
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1993, 119 (04): : 681 - 697
  • [26] A Dynamic Model for Effective and Optimal Planning of Formwork in Construction Projects
    Baskova, Renata
    Tazikova, Alena
    Strukova, Zuzana
    Kozlovska, Maria
    Cabala, Jozef
    BUILDINGS, 2023, 13 (07)
  • [27] Scheduling-based risk estimation and safety planning for construction projects
    Yi, Kyoo-Jin
    Langford, David
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2006, 132 (06) : 626 - 635
  • [28] The Application of Artificial Intelligence Planning and Scheduling in Photovoltaic Plant Construction Projects
    Ruiz, Jesus Gil
    Diaz, Hernan
    Crespo, Ruben Gonzalez
    EXPERT SYSTEMS, 2025, 42 (02)
  • [29] The Multimode Resource-Constrained Project Scheduling Problem for Repetitive Activities in Construction Projects
    Garcia-Nieves, J. D.
    Ponz-Tienda, J. L.
    Salcedo-Bernal, A.
    Pellicer, E.
    COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING, 2018, 33 (08) : 655 - 671
  • [30] Multi-Objective Resource-Constrained Scheduling in Large and Repetitive Construction Projects
    Lazari, Vasiliki
    Chassiakos, Athanasios
    Karatzas, Stylianos
    ALGORITHMS, 2024, 17 (08)