Production based scheduling method for linear construction in road projects

被引:0
|
作者
S. R. Kannan
R. Senthil
机构
[1] Easwari Engineering College,Dept. of Civil Engineering
[2] Anna University,Dept. of Civil Engineering
来源
关键词
scheduling; productivity; linear activities; road projects; delphi;
D O I
暂无
中图分类号
学科分类号
摘要
Scheduling of road projects has always been a challenging endeavor in the construction industry as project durations are quite often unpredictable. It depends on the production rates of individual activities which are governed by factors such as availability of resources, environmental and geographical conditions. The current trend in road project scheduling is based on productivity of a certain item of work with a defined crew as resource. Practically, as these production rates are not achieved as per plan, an attempt has been made in this work to propose a simple model to estimate road project durations utilizing probable production rates of activities. A simulation model attempted to arrive at probable production rates of these activities has indicated a wide range of values that cannot lead to accurate time estimates. A more specific range of production rate estimates have been arrived adopting Delphi process to account for factors mainly within the purview of constructors. The basic framework for time estimates has been proposed by adopting Linear Scheduling Method (LSM) for scheduling due to limitations of network techniques in road works. A simple flowchart model of the time estimate method has been presented incorporating probable production rates defining crews and buffer distances.
引用
收藏
页码:1292 / 1301
页数:9
相关论文
共 50 条
  • [21] Petri Net-based scheduling of construction projects
    Sawhney, A
    Mund, A
    Chaitavatputtiporn, T
    CIVIL ENGINEERING AND ENVIRONMENTAL SYSTEMS, 2003, 20 (04) : 255 - 271
  • [22] Prediction Equation Study of Road and Regolith Erosion in Production and Construction Projects
    Yan, Nan
    Qin, Wei
    Zuo, Changqing
    Yin, Zhe
    Li, Bai
    Guo, Qiankun
    Shan, Zhijie
    Wang, Zhaoyan
    PROCEEDINGS OF THE 2015 INTERNATIONAL FORUM ON ENERGY, ENVIRONMENT SCIENCE AND MATERIALS, 2015, 40 : 846 - 853
  • [23] A multi-objective integrated model for selecting, scheduling, and budgeting road construction projects
    Hosseininasab, Seyyed-Mohammadreza
    Shetab-Boushehri, Seyyed-Nader
    Hejazi, Seyed Reza
    Karimi, Hadi
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2018, 271 (01) : 262 - 277
  • [24] Network-level scheduling of road construction projects considering user and business impacts
    Miralinaghi, Mohammad
    Woldemariam, Wubeshet
    Abraham, Dulcy M.
    Chen, Sikai
    Labi, Samuel
    Chen, Zhibin
    COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING, 2020, 35 (07) : 650 - 667
  • [25] Multipurpose linear programming optimization model for repetitive activities scheduling in construction projects
    Diego Garcia-Nieves, Juan
    Luis Ponz-Tienda, Jose
    Ospina-Alvarado, Angelica
    Bonilla-Palacios, Mateo
    AUTOMATION IN CONSTRUCTION, 2019, 105
  • [26] Scheduling optimization model for linear projects with resource transfer in diverse construction scenarios
    Zhao, Xuan
    Zhou, Guohua
    ENGINEERING OPTIMIZATION, 2024,
  • [27] Optimized scheduling of linear projects
    Moselhi, O
    Hassanein, A
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2003, 129 (06) : 664 - 673
  • [28] SCHEDULING AND CONTROL OF LINEAR PROJECTS
    ELDIN, NN
    SENOUCI, AB
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 1994, 21 (02) : 219 - 230
  • [29] Enhanced heuristic for finance-based scheduling of construction projects
    Gajpal, Yuvraj
    Elazouni, Ashraf
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2015, 33 (07) : 531 - 553
  • [30] The method of scheduling construction projects increasing the use of resources of the general contractor
    Tomczak, Michal
    Jaskowski, Piotr
    13TH INTERNATIONAL CONFERENCE MODERN BUILDING MATERIALS, STRUCTURES AND TECHNIQUES (MBMST 2019), 2019, : 683 - 690