Petri Net-based scheduling of construction projects

被引:7
|
作者
Sawhney, A
Mund, A
Chaitavatputtiporn, T
机构
[1] Arizona State Univ, Del E Webb Sch Construct, Tempe, AZ 85287 USA
[2] Western Michigan Univ, Kalamazoo, MI 49008 USA
关键词
Petri Nets; simulation; construction scheduling; process modeling; hierarchical; modular;
D O I
10.1080/10286600310001633848
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Scheduling of construction projects is an important planning function that provides a clear picture of the construction activities, construction sequence, and construction resources to the agencies involved in construction. In this paper a Petri Net-based scheduling method that is geared towards resource-based scheduling of construction projects is described. Petri Nets are graphical and mathematical modeling tools that can be used to perform static and dynamic analysis of systems. Under the proposed technique Generalized Stochastic Petri Net (GSPN) modeling elements are used to develop a construction schedule. Resources required to accomplish construction work tasks are explicitly identified and allocated to the corresponding work tasks. In addition the technique provides hierarchical features that allow top-down breakdown of a construction project and modular features to schedule repetitive units. The paper summarizes the steps required to perform scheduling of construction projects using the proposed technique and highlights its advantages. The scheduling of a sample bridge project also highlights the significant benefits of the method.
引用
收藏
页码:255 / 271
页数:17
相关论文
共 50 条
  • [1] Petri net-based scheduling of a bridge project
    Sawhney, A
    Vamadevan, A
    [J]. CONSTRUCTION CONGRESS VI, PROCEEDING: BUILDING TOGETHER FOR A BETTER TOMORROW IN AN INCREASINGLY COMPLEX WORLD, 2000, : 107 - 114
  • [2] Petri net-based project scheduling methods: Advantages and shortcomings
    Kirytopoulos, Konstantinos
    Diamantas, Viktor
    Leopoulos, Vrassidas
    Dimadis, Christos
    [J]. MODELLING AND SIMULATION 2006, 2006, : 335 - +
  • [3] A Petri Net-based Modeling and Scheduling with a Branch and Bound Algorithm
    Kim, Hyun-Jung
    Lee, Jun-Ho
    Lee, Tae-Eog
    [J]. PROCEEDINGS 2012 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS (SMC), 2012, : 1779 - 1784
  • [4] Fuzzy Petri net-based optimum scheduling of FMS with human factors
    Xu, JX
    [J]. PROCEEDINGS OF THE 35TH IEEE CONFERENCE ON DECISION AND CONTROL, VOLS 1-4, 1996, : 4451 - 4452
  • [5] Petri Net-Based Problem Solving
    Capkovic, Frantisek
    [J]. 2014 IEEE 12TH INTERNATIONAL SYMPOSIUM ON INTELLIGENT SYSTEMS AND INFORMATICS (SISY), 2014, : 203 - 208
  • [6] Petri net-based decision nets
    Simoes, MAS
    Barretto, MRP
    [J]. INTELLIGENT MANUFACTURING SYSTEMS 1998 (IMS'98), 1999, : 251 - 256
  • [7] A Petri net-based integrated control and scheduling scheme for flexible manufacturing cells
    Lin, JT
    Lee, CC
    [J]. COMPUTER INTEGRATED MANUFACTURING SYSTEMS, 1997, 10 (02): : 109 - 122
  • [8] A Petri net-based workflow system
    Li, Xiaofang
    Wang, Congming
    Liang, Y.
    [J]. DYNAMICS OF CONTINUOUS DISCRETE AND IMPULSIVE SYSTEMS-SERIES B-APPLICATIONS & ALGORITHMS, 2006, 13E : 3726 - 3729
  • [9] A PETRI NET-BASED HYBRID HEURISTIC SCHEDULING ALGORITHM FOR FLEXIBLE MANUFACTURING SYSTEM
    Xu, S. Z.
    [J]. INTERNATIONAL JOURNAL OF SIMULATION MODELLING, 2019, 18 (02) : 325 - 334
  • [10] Petri net-based modeling and performance analysis of transaction scheduling in grid database
    Han, Yaojun
    Jiang, Changjun
    Luo, Xuemei
    [J]. COMPEL-THE INTERNATIONAL JOURNAL FOR COMPUTATION AND MATHEMATICS IN ELECTRICAL AND ELECTRONIC ENGINEERING, 2009, 28 (06) : 1458 - 1470