Production based scheduling method for linear construction in road projects

被引:0
|
作者
S. R. Kannan
R. Senthil
机构
[1] Easwari Engineering College,Dept. of Civil Engineering
[2] Anna University,Dept. of Civil Engineering
来源
关键词
scheduling; productivity; linear activities; road projects; delphi;
D O I
暂无
中图分类号
学科分类号
摘要
Scheduling of road projects has always been a challenging endeavor in the construction industry as project durations are quite often unpredictable. It depends on the production rates of individual activities which are governed by factors such as availability of resources, environmental and geographical conditions. The current trend in road project scheduling is based on productivity of a certain item of work with a defined crew as resource. Practically, as these production rates are not achieved as per plan, an attempt has been made in this work to propose a simple model to estimate road project durations utilizing probable production rates of activities. A simulation model attempted to arrive at probable production rates of these activities has indicated a wide range of values that cannot lead to accurate time estimates. A more specific range of production rate estimates have been arrived adopting Delphi process to account for factors mainly within the purview of constructors. The basic framework for time estimates has been proposed by adopting Linear Scheduling Method (LSM) for scheduling due to limitations of network techniques in road works. A simple flowchart model of the time estimate method has been presented incorporating probable production rates defining crews and buffer distances.
引用
收藏
页码:1292 / 1301
页数:9
相关论文
共 50 条
  • [41] Finance-based scheduling of construction projects using integer programming
    Elazouni, AM
    Gab-Allah, AA
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2004, 130 (01): : 15 - 24
  • [42] Scheduling-based risk estimation and safety planning for construction projects
    Yi, Kyoo-Jin
    Langford, David
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2006, 132 (06) : 626 - 635
  • [43] Entropy-based scheduling of resource-constrained construction projects
    Christodoulou, Symeon
    Ellinas, Georgios
    Aslani, Pooyan
    AUTOMATION IN CONSTRUCTION, 2009, 18 (07) : 919 - 928
  • [44] Non-unit-based planning and scheduling of repetitive construction projects
    Huang, Rong-Yau
    Sun, Kuo-Shun
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2006, 132 (06) : 585 - 597
  • [45] Scheduling evaluation in construction projects using the critical chain project management method
    Sembiring, N.
    Putra, A.
    INTERNATIONAL CONFERENCE ON INNOVATION IN ENGINEERING AND VOCATIONAL EDUCATION 2019 (ICIEVE 2019), PTS 1-4, 2020, 830
  • [46] Production scheduling in construction
    Thiengburanathum, P
    Wang, Y
    Diekmann, JE
    Molenaar, K
    INNOVATIVE DEVELOPMENTS IN ARCHITECTURE, ENGINEERING AND CONTRUCTION, 2003, : 325 - 334
  • [47] Effects of toll road construction on local road projects in Indonesia
    Andani, I. G. Ayu
    Puello, Lissy La Paix
    Geurs, Karst
    JOURNAL OF TRANSPORT AND LAND USE, 2019, 12 (01) : 179 - 199
  • [48] Planning linear construction projects: automated method for the generation of earthwork activities
    Askew, WH
    Al-jibouri, SH
    Mawdesley, MJ
    Patterson, DE
    AUTOMATION IN CONSTRUCTION, 2002, 11 (06) : 643 - 653
  • [49] Causes of claims in road construction projects in the UAE
    Mishmish, Malek
    El-Sayegh, Sameh M.
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2018, 18 (01) : 26 - 33
  • [50] Prediction of construction projects' costs based on fusion method
    Fang Shutian
    Zhao Tianyi
    Zhang Ying
    ENGINEERING COMPUTATIONS, 2017, 34 (07) : 2396 - 2408