共 24 条
- [1] Linear Scheduling Model with Varying Production Rates JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2011, 137 (08): : 574 - 582
- [3] Production based scheduling method for linear construction in road projects KSCE Journal of Civil Engineering, 2014, 18 : 1292 - 1301
- [4] Production rate determination for linear construction projects based on linear scheduling method Int. J. Smart Home, 4 (143-152): : 143 - 152
- [6] Multiobjective linear program for scheduling repetitive projects Cost Eng (Morgantown WVa), 12 (41-45):
- [7] Segmentation and Repetitive Scheduling of Linear Continuous Construction Projects OPERATIONS RESEARCH PROCEEDINGS 2021, 2022, : 134 - 140
- [9] Linear Scheduling Optimization Model for Planning Repetitive Construction Projects CONSTRUCTION RESEARCH CONGRESS 2020: PROJECT MANAGEMENT AND CONTROLS, MATERIALS, AND CONTRACTS, 2020, : 1129 - 1138
- [10] Linear Optimization Model for Scheduling Repetitive Construction Projects with Multiple Crews CONSTRUCTION RESEARCH CONGRESS 2022: PROJECT MANAGEMENT AND DELIVERY, CONTRACTS, AND DESIGN AND MATERIALS, 2022, : 461 - 471