Genetic algorithm for selecting and scheduling interdependent projects

被引:23
|
作者
Jong, JC
Schonfeld, P
机构
[1] Sinotech Engn Consultants Inc, Civ & Hydr Engn Res Ctr, Taipei 105, Taiwan
[2] Univ Maryland, Dept Civil Engn, College Pk, MD 20742 USA
关键词
Computer simulation - Dynamic programming - Function evaluation - Fuzzy sets - Genetic algorithms - Integral equations - Neural networks - Planning - Queueing theory - Scheduling;
D O I
10.1061/(ASCE)0733-950X(2001)127:1(45)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Investment planning for systems with interdependent queues, such as a series of interacting waterway locks, is a very challenging problem. Under budget constraints, it must be determined which projects should be selected and when they should be funded to minimize the present value of total cost over the planning horizon. Due to interdependence among service stations (e.g., locks), investment planning for such systems cannot be analyzed separately for each station. Published models on investment planning for interdependent projects are rare and difficult to apply to a series of queuing systems. A genetic algorithm approach is presented in this paper for solving project sequencing and scheduling problems for such systems. A numerical example is designed to investigate the proposed algorithm. Results indicate that the proposed approach is quite efficient in finding very good solutions.
引用
收藏
页码:45 / 52
页数:8
相关论文
共 50 条
  • [1] Scheduling interdependent waterway projects through simulation and genetic optimization
    Wang, SL
    Schonfeld, P
    [J]. JOURNAL OF WATERWAY PORT COASTAL AND OCEAN ENGINEERING, 2005, 131 (03) : 89 - 97
  • [2] Scheduling interdependent waterway projects through simulation and genetic optimization
    Wang, Shiaau-Lir
    Schonfeld, Paul
    [J]. J. Waterw. Port Coast. Ocean Eng., 1600, 3 (89-97):
  • [3] Model for the selection and scheduling of interdependent projects
    Zuluaga, Andrea
    Sefair, Jorge A.
    Mcdaglia, Andrs L.
    [J]. 2007 IEEE SYSTEMS AND INFORMATION ENGINEERING DESIGN SYMPOSIUM, 2007, : 191 - 197
  • [5] A Hybrid Genetic Algorithm for Scheduling and Selecting a Project Portfolio
    Shi, Bo
    Wang, Hong
    Qi, Lu
    [J]. FOUNDATIONS OF INTELLIGENT SYSTEMS (ISKE 2011), 2011, 122 : 69 - +
  • [6] Scheduling Optimization of Prefabricated Construction Projects by Genetic Algorithm
    Xie, Linlin
    Chen, Yajiao
    Chang, Ruidong
    [J]. APPLIED SCIENCES-BASEL, 2021, 11 (12):
  • [7] Selecting and scheduling infrastructure rehabilitation projects
    Baur, R
    Kropp, I
    [J]. 2ND WORLD WATER CONGRESS: WATER DISTRIBUTION AND WATER SERVICES MANAGEMENT, 2002, 2 (04): : 43 - 50
  • [8] Selection and scheduling of interdependent transportation projects with island models
    Tao, Xianding
    Schonfeld, Paul
    [J]. Planning and Analysis 2006, 2006, (1981): : 133 - 141
  • [9] Automated Resource Scheduling for Construction Projects Using Genetic Algorithm
    Moharram, Raghda M.
    Essawy, Yasmeen A. S.
    Hosny, Osama S.
    [J]. PROCEEDINGS OF THE CANADIAN SOCIETY OF CIVIL ENGINEERING ANNUAL CONFERENCE 2022, VOL 1, CSCE 2022, 2023, 363 : 513 - 522
  • [10] A fuzzy computational approach for selecting interdependent projects using prioritized criteria
    Beseiso, Majdi
    Kumar, Gulshan
    [J]. JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2021, 40 (06) : 11341 - 11354