共 50 条
- [1] Resource scheduling of construction projects using a hybrid genetic algorithm model [J]. SYSTEM-BASED VISION FOR STRATEGIC AND CREATIVE DESIGN, VOLS 1-3, 2003, : 205 - 209
- [2] Use of genetic algorithms in resource scheduling of construction projects [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2004, 130 (06): : 869 - 877
- [3] Scheduling Optimization of Prefabricated Construction Projects by Genetic Algorithm [J]. APPLIED SCIENCES-BASEL, 2021, 11 (12):
- [4] Scheduling construction projects using evolutionary algorithm [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2006, 132 (08): : 861 - 870
- [6] Resource Constrained Project Scheduling of Construction Engineering with Genetic Algorithm [J]. 2008 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-11, 2008, : 1466 - 1470
- [7] Resource allocation in construction projects using genetic algorithms [J]. KUWAIT JOURNAL OF SCIENCE & ENGINEERING, 1998, 25 (01): : 145 - 161
- [9] Scheduling of Multiple Projects with Resource Constraints Using Genetic Algorithms [J]. MANUFACTURING AUTOMATION TECHNOLOGY, 2009, 392-394 : 755 - 760
- [10] Automated Train Scheduling System using Genetic Algorithm [J]. 2015 INTERNATIONAL SYMPOSIUM ON ADVANCED COMPUTING AND COMMUNICATION (ISACC), 2015, : 28 - 33