Automated Resource Scheduling for Construction Projects Using Genetic Algorithm

被引:0
|
作者
Moharram, Raghda M. [1 ]
Essawy, Yasmeen A. S. [1 ,2 ]
Hosny, Osama S. [1 ]
机构
[1] Amer Univ Cairo, Dept Construct Engn, New Cairo, Egypt
[2] Ain Shams Univ, Dept Struct Engn, Cairo, Egypt
关键词
Automated resource scheduling; Genetic algorithm; Construction projects;
D O I
10.1007/978-3-031-34593-7_32
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Site advance methods for planning and scheduling are essential for effective project management. Typically, construction managers tend to produce schedules based on two constraints: (1) Minimize Project Duration and (2) Allocate Minimum Resources. Moreover, deficits in the cash flow result in reduced profits at the end of the project and delays if financing problems arise, which results in damages (usually additional costs). Traditional scheduling tools like the Critical Path Method (CPM) and Time Constrained Project Scheduling Problem (TCPSP) do not show high efficiency in achieving the required objectives, as scheduling gets complicated. Advanced planning and scheduling methods will be used to produce a feasible schedule that meets specific objectives. This paper proposes amulti-objectivemodel, (1) minimum project duration, (2) resource availability, and (3) minimum cash flow deficit. The model is divided into two modules. The first module produces an optimized, automated schedule achieving the objective of minimum project duration. The second module applies an optimized resource constraint scheduling using user input data of the available resources to allocate the resources on each activity while maintaining the maximum number of resources on site. The model is optimized using an evolutionary algorithm, namely: Genetic Algorithm (GA).
引用
收藏
页码:513 / 522
页数:10
相关论文
共 50 条
  • [1] Resource scheduling of construction projects using a hybrid genetic algorithm model
    Senouci, AB
    Naji, KK
    [J]. SYSTEM-BASED VISION FOR STRATEGIC AND CREATIVE DESIGN, VOLS 1-3, 2003, : 205 - 209
  • [2] Use of genetic algorithms in resource scheduling of construction projects
    Senouci, AB
    Eldin, NN
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2004, 130 (06): : 869 - 877
  • [3] Scheduling Optimization of Prefabricated Construction Projects by Genetic Algorithm
    Xie, Linlin
    Chen, Yajiao
    Chang, Ruidong
    [J]. APPLIED SCIENCES-BASEL, 2021, 11 (12):
  • [4] Scheduling construction projects using evolutionary algorithm
    Jaskowski, Piotr
    Sobotka, Anna
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2006, 132 (08): : 861 - 870
  • [5] Improved genetic algorithm for resource-constrained scheduling of large projects
    Kim, Jin-Lee
    [J]. CANADIAN JOURNAL OF CIVIL ENGINEERING, 2009, 36 (06) : 1016 - 1027
  • [6] Resource Constrained Project Scheduling of Construction Engineering with Genetic Algorithm
    Wang, Lixing
    Ip, W. H.
    Lee, Carman K. M.
    [J]. 2008 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-11, 2008, : 1466 - 1470
  • [7] Resource allocation in construction projects using genetic algorithms
    Al-Tabtabai, H
    Alex, AP
    [J]. KUWAIT JOURNAL OF SCIENCE & ENGINEERING, 1998, 25 (01): : 145 - 161
  • [8] A genetic algorithm-based method for scheduling repetitive construction projects
    Long, Luong Duc
    Ohsato, Ario
    [J]. AUTOMATION IN CONSTRUCTION, 2009, 18 (04) : 499 - 511
  • [9] Scheduling of Multiple Projects with Resource Constraints Using Genetic Algorithms
    Qiao, L. H.
    Wang, C.
    [J]. MANUFACTURING AUTOMATION TECHNOLOGY, 2009, 392-394 : 755 - 760
  • [10] Automated Train Scheduling System using Genetic Algorithm
    Barman, Rahul
    Baishya, Chandra Jyoti
    Kharmalki, Bandonlang
    Syiemlieh, Aphibakordor
    Pegu, Kriti Bikash
    Das, Tanuja
    Saha, Goutam
    [J]. 2015 INTERNATIONAL SYMPOSIUM ON ADVANCED COMPUTING AND COMMUNICATION (ISACC), 2015, : 28 - 33