Automated Resource Scheduling for Construction Projects Using Genetic Algorithm

被引:0
|
作者
Moharram, Raghda M. [1 ]
Essawy, Yasmeen A. S. [1 ,2 ]
Hosny, Osama S. [1 ]
机构
[1] Amer Univ Cairo, Dept Construct Engn, New Cairo, Egypt
[2] Ain Shams Univ, Dept Struct Engn, Cairo, Egypt
关键词
Automated resource scheduling; Genetic algorithm; Construction projects;
D O I
10.1007/978-3-031-34593-7_32
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Site advance methods for planning and scheduling are essential for effective project management. Typically, construction managers tend to produce schedules based on two constraints: (1) Minimize Project Duration and (2) Allocate Minimum Resources. Moreover, deficits in the cash flow result in reduced profits at the end of the project and delays if financing problems arise, which results in damages (usually additional costs). Traditional scheduling tools like the Critical Path Method (CPM) and Time Constrained Project Scheduling Problem (TCPSP) do not show high efficiency in achieving the required objectives, as scheduling gets complicated. Advanced planning and scheduling methods will be used to produce a feasible schedule that meets specific objectives. This paper proposes amulti-objectivemodel, (1) minimum project duration, (2) resource availability, and (3) minimum cash flow deficit. The model is divided into two modules. The first module produces an optimized, automated schedule achieving the objective of minimum project duration. The second module applies an optimized resource constraint scheduling using user input data of the available resources to allocate the resources on each activity while maintaining the maximum number of resources on site. The model is optimized using an evolutionary algorithm, namely: Genetic Algorithm (GA).
引用
收藏
页码:513 / 522
页数:10
相关论文
共 50 条
  • [21] Automated Scheduling of Hostel Room Allocation Using Genetic Algorithm
    Alfred, Rayner
    Yu, Hin Fuk
    DATA MANAGEMENT, ANALYTICS AND INNOVATION, ICDMAI 2019, VOL 1, 2020, 1042 : 151 - 160
  • [22] Resource Allocation in a Repetitive Project Scheduling Using Genetic Algorithm
    Samuel, Biju
    Mathew, Jeeno
    INTERNATIONAL CONFERENCE ON RECENT ADVANCES IN MATERIALS, MECHANICAL AND CIVIL ENGINEERING, 2018, 330
  • [23] A genetic algorithm for realistic resource scheduling
    Beck, FL
    Thomalla, CS
    2001 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS, VOLS 1-5: E-SYSTEMS AND E-MAN FOR CYBERNETICS IN CYBERSPACE, 2002, : 2522 - 2527
  • [24] Genetic algorithm for selecting and scheduling interdependent projects
    Jong, JC
    Schonfeld, P
    JOURNAL OF WATERWAY PORT COASTAL AND OCEAN ENGINEERING, 2001, 127 (01) : 45 - 52
  • [26] Factors Affecting Implementation of Resource Scheduling in Indian Construction Projects
    Venkatesh, M. P.
    Malathi, Balasubramanian
    Umarani, C.
    ADVANCED BUILDING MATERIALS AND SUSTAINABLE ARCHITECTURE, PTS 1-4, 2012, 174-177 : 2782 - 2786
  • [27] Optimisation for job scheduling at automated container terminals using genetic algorithm
    Skinner, Bradley
    Yuan, Shuai
    Huang, Shoudong
    Liu, Dikai
    Cai, Binghuang
    Dissanayake, Gamini
    Lau, Haye
    Bott, Andrew
    Pagac, Daniel
    COMPUTERS & INDUSTRIAL ENGINEERING, 2013, 64 (01) : 511 - 523
  • [28] Scheduling Construction Projects Under Fuzzy Modelling of Resource Constraints
    Kulejewski, Janusz
    Ibadov, Nabi
    Krzeminski, Michal
    XXVII R-S-P SEMINAR, THEORETICAL FOUNDATION OF CIVIL ENGINEERING (27RSP) (TFOCE 2018), 2018, 196
  • [29] Optimized scheduling of resource-constraints in projects for smart construction
    Lin, Jerry Chun-Wei
    Lv, Qing
    Yu, Dehu
    Srivastava, Gautam
    Chen, Chun-Hao
    INFORMATION PROCESSING & MANAGEMENT, 2022, 59 (05)
  • [30] Genetic algorithm-based multi-objective model for scheduling of linear construction projects
    Senouci, Ahmed
    Al-Derham, Hassan R.
    ADVANCES IN ENGINEERING SOFTWARE, 2008, 39 (12) : 1023 - 1028