Automated Resource Scheduling for Construction Projects Using Genetic Algorithm

被引:0
|
作者
Moharram, Raghda M. [1 ]
Essawy, Yasmeen A. S. [1 ,2 ]
Hosny, Osama S. [1 ]
机构
[1] Amer Univ Cairo, Dept Construct Engn, New Cairo, Egypt
[2] Ain Shams Univ, Dept Struct Engn, Cairo, Egypt
关键词
Automated resource scheduling; Genetic algorithm; Construction projects;
D O I
10.1007/978-3-031-34593-7_32
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Site advance methods for planning and scheduling are essential for effective project management. Typically, construction managers tend to produce schedules based on two constraints: (1) Minimize Project Duration and (2) Allocate Minimum Resources. Moreover, deficits in the cash flow result in reduced profits at the end of the project and delays if financing problems arise, which results in damages (usually additional costs). Traditional scheduling tools like the Critical Path Method (CPM) and Time Constrained Project Scheduling Problem (TCPSP) do not show high efficiency in achieving the required objectives, as scheduling gets complicated. Advanced planning and scheduling methods will be used to produce a feasible schedule that meets specific objectives. This paper proposes amulti-objectivemodel, (1) minimum project duration, (2) resource availability, and (3) minimum cash flow deficit. The model is divided into two modules. The first module produces an optimized, automated schedule achieving the objective of minimum project duration. The second module applies an optimized resource constraint scheduling using user input data of the available resources to allocate the resources on each activity while maintaining the maximum number of resources on site. The model is optimized using an evolutionary algorithm, namely: Genetic Algorithm (GA).
引用
收藏
页码:513 / 522
页数:10
相关论文
共 50 条