Scheduling construction projects using evolutionary algorithm

被引:45
|
作者
Jaskowski, Piotr
Sobotka, Anna
机构
[1] Lublin Univ Technol, Fac Civil & Sanit Engn, PL-20618 Lublin, Poland
[2] AGH Univ Sci & Technol, Fac Min & Geoengn, PL-30059 Krakow, Poland
关键词
D O I
10.1061/(ASCE)0733-9364(2006)132:8(861)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper attempts to use evolutionary algorithms to solve the problem of minimizing construction project duration in deterministic conditions, with in-time changeable and limited accessibility of renewable resources (workforce, machines, and equipment). Particular construction processes (with various levels of complexity) must be conducted in the established technological order and can be executed with different technological and organizational variants (different contractors, technologies, and ways of using resources). Such a description of realization conditions allows the method to also be applied to solving more complex problems that occur in construction practice (e.g., scheduling resources for a whole company, not only for a single project). The method's versatility distinguishes it from other approaches presented in numerous publications. To assess the solutions generated by the evolutionary algorithm, the writers worked a heuristic algorithm (for the allocation of resources and the calculation of the shortest project duration). The results obtained by means of this methodology seem to be similar to outcomes of other comparable methodologies. The proposed methodology (the model and the computer system) may be of great significance to the construction industry. The paper contains some examples of the practical use of the evolutionary algorithm for project planning with time constraints.
引用
收藏
页码:861 / 870
页数:10
相关论文
共 50 条
  • [1] Scheduling of construction projects by means of evolutionary algorithms
    Rogalska, Magdalena
    Bozejko, Ciech
    Hejducki, Zdzislaw
    [J]. 9TH INTERNATIONAL CONFERENCE: MODERN BUILDING MATERIALS, STRUCTURES AND TECHNIQUES, VOLS 1-3, 2008, : 360 - +
  • [2] Automated Resource Scheduling for Construction Projects Using Genetic Algorithm
    Moharram, Raghda M.
    Essawy, Yasmeen A. S.
    Hosny, Osama S.
    [J]. PROCEEDINGS OF THE CANADIAN SOCIETY OF CIVIL ENGINEERING ANNUAL CONFERENCE 2022, VOL 1, CSCE 2022, 2023, 363 : 513 - 522
  • [3] Multicriteria construction project scheduling method using evolutionary algorithm
    Piotr Jaskowski
    Anna Sobotka
    [J]. Operational Research, 2006, 6 (3) : 283 - 297
  • [4] Resource scheduling of construction projects using a hybrid genetic algorithm model
    Senouci, AB
    Naji, KK
    [J]. SYSTEM-BASED VISION FOR STRATEGIC AND CREATIVE DESIGN, VOLS 1-3, 2003, : 205 - 209
  • [5] Scheduling Optimization of Prefabricated Construction Projects by Genetic Algorithm
    Xie, Linlin
    Chen, Yajiao
    Chang, Ruidong
    [J]. APPLIED SCIENCES-BASEL, 2021, 11 (12):
  • [6] Time/cost optimization using hybrid evolutionary algorithm in construction project scheduling
    Rogalska, Magdalena
    Bozejko, Wojciech
    Hejducki, Zdzislaw
    [J]. AUTOMATION IN CONSTRUCTION, 2008, 18 (01) : 24 - 31
  • [7] CONSTRUCTION PROJECTS SCHEDULING USING GIS TOOLS
    Bansal, V. K.
    Pal, Mahesh
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2011, 11 (01) : 1 - 18
  • [8] Scheduling of Construction Projects
    Bozejko, Wojciech
    Wodecki, Mieczyslaw
    [J]. PROCEEDINGS OF THE 6TH EUROPEAN CONFERENCE ON MANAGEMENT LEADERSHIP AND GOVERNANCE, 2010, : 64 - 72
  • [9] Scheduling Projects by a Hybrid Evolutionary Algorithm with Self-Adaptive Processes
    Yannibelli, Virginia
    Amandi, Analia
    [J]. ADVANCES IN ARTIFICIAL INTELLIGENCE AND SOFT COMPUTING, MICAI 2015, PT I, 2015, 9413 : 401 - 412
  • [10] A multiobjective evolutionary algorithm for scheduling and inspection planning in software development projects
    Hanne, T
    Nickel, S
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2005, 167 (03) : 663 - 678