Multicriteria construction project scheduling method using evolutionary algorithm

被引:0
|
作者
Piotr Jaskowski
Anna Sobotka
机构
[1] Lublin University of Technology,Institute of Construction
[2] AGH University of Science and Technology,Faculty of Mining and Geoengineering
关键词
Construction Project Scheduling; Multicriteria Optimization; Contractor Selection;
D O I
10.1007/BF02941257
中图分类号
学科分类号
摘要
The project owners demand that construction projects are to be accomplished on time and to budget. Regardless of the construction project procurement system, duration and cost are the key factors determining project’s economic efficiency and fulfillment of the owner’s needs and requirements. Beside quality, they are basic criteria taken into account in project planning, scheduling and contractors selection. The multicriteria optimization of schedules is a complex question being among NP-hard problems. There is a demand for methods of proved reliability that would facilitate solving practical cases within relatively short time and allow for numerous constraints typical for construction. Due to limitations of precise methods in solving complex practical issues and imperfection of heuristic methods, the metaheuristic approach (evolutionary algorithm) has been adopted to solve multiple-objective combinatorial optimization scheduling problems. The method has been applied to solve a practical case of bicriteria (time and cost minimization) scheduling optimization and contractor selection problem.
引用
收藏
页码:283 / 297
页数:14
相关论文
共 50 条
  • [1] Time/cost optimization using hybrid evolutionary algorithm in construction project scheduling
    Rogalska, Magdalena
    Bozejko, Wojciech
    Hejducki, Zdzislaw
    [J]. AUTOMATION IN CONSTRUCTION, 2008, 18 (01) : 24 - 31
  • [2] Scheduling construction projects using evolutionary algorithm
    Jaskowski, Piotr
    Sobotka, Anna
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2006, 132 (08): : 861 - 870
  • [3] Financial Resource Multi Project Scheduling using Evolutionary Algorithm
    Sergeevna, Budovich Lidia
    Nikolaevna, Kulikova Natalia
    Viktorovna, Varfalovskaya Victoria
    [J]. INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS, 2021, 20 (04): : 672 - 677
  • [4] Multicriteria network design using evolutionary algorithm
    Kumar, R
    Banerjee, N
    [J]. GENETIC AND EVOLUTIONARY COMPUTATION - GECCO 2003, PT II, PROCEEDINGS, 2003, 2724 : 2179 - 2190
  • [5] Fuzzy Evolutionary Algorithm in Construction Project for Valuation
    Li, Huijing
    [J]. JOURNAL OF ELECTRICAL SYSTEMS, 2023, 19 (04) : 128 - 143
  • [6] An evolutionary algorithm for resource-constrained project scheduling
    Hindi, KS
    Yang, HB
    Fleszar, K
    [J]. IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION, 2002, 6 (05) : 512 - 518
  • [7] Multicriteria network design using distributed evolutionary algorithm
    Kumar, R
    [J]. HIGH PERFORMANCE COMPUTING - HIPC 2003, 2003, 2913 : 343 - 352
  • [8] A hybrid evolutionary algorithm for the resource constrained project scheduling problem
    Thammano, Arit
    Phu-ang, Ajchara
    [J]. PROCEEDINGS OF THE SEVENTEENTH INTERNATIONAL SYMPOSIUM ON ARTIFICIAL LIFE AND ROBOTICS (AROB 17TH '12), 2012, : 834 - 837
  • [9] Evolutionary Algorithm for Software Project Scheduling Considering Team Relationships
    Zhang, Jianhao
    Shen, Xiaoning
    Yao, Chengbin
    [J]. IEEE ACCESS, 2023, 11 : 43690 - 43706
  • [10] Evolutionary Algorithm for Project Scheduling under Irregular Resource Changes
    Zaman, Forhad
    Elsayed, Saber
    Sarker, Ruhul
    Essam, Daryl
    Coello Coello, Carlos A.
    [J]. 2019 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2019, : 403 - 410