Research of project risk assessment based on SPA

被引:0
|
作者
Liu, Jun'e [1 ]
Lu, Rongrong [1 ]
Guo, Zhanglin [1 ]
机构
[1] Beijing Wuzi Univ, Informat Sch, Beijing 101149, Peoples R China
关键词
SPA; risk management; the correlation coefficient;
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
The project risk management is playing a more important role in the project management. In this article, the method of SPA is used in the project risk management. Through analyzing the certain and uncertain factors in a project, the system's risk is assessed by set pair analysis. The safety and danger are the opposite factors which could become a set pair. According to analysis of the set pair of the Salem-danger factors, correlation coefficient will be determined, And at the same time, it can express the system's risk rank. For avoiding the risk of the project, the corresponding measures should be taken to protect the project. Using the set pair analysis method, the result of the project's risk assessment is simple and reasonable, and the information is used effectively.
引用
收藏
页码:392 / 395
页数:4
相关论文
共 50 条
  • [1] Research on the Risk Assessment of Railway Engineering Project Based on FAHP Model
    Li, Suying
    Tian, Ya
    Wu, Yongli
    [J]. Journal of Railway Engineering Society, 2019, 36 (07) : 92 - 99
  • [2] Risk Assessment Research of Enterprise BI Project Implementation Based on Fuzzy Comprehensive Assessment
    Ma, XiaoLong
    Liu, LanJuan
    [J]. PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON SOCIAL SCIENCE, EDUCATION MANAGEMENT AND SPORTS EDUCATION, 2015, 39 : 2457 - 2462
  • [3] Research on Risk Assessment in Project Construction Process
    She, Yuexia
    Song, Zhengrong
    Wu, Hang
    Liu, Chao
    Sun, Liwen
    [J]. INTERNATIONAL CONFERENCE ON FRONTIERS OF ENERGY, ENVIRONMENTAL MATERIALS AND CIVIL ENGINEERING (FEEMCE 2013), 2013, : 124 - 128
  • [4] Research on Risk Assessment of Smart Grid Project
    Xu, Wanyu
    [J]. PROCEEDINGS OF THE 2015 4TH NATIONAL CONFERENCE ON ELECTRICAL, ELECTRONICS AND COMPUTER ENGINEERING ( NCEECE 2015), 2016, 47 : 558 - 562
  • [5] Research on Risk Assessment of Wind Power Project
    Rong, Zhang Xi
    Zhi, Li
    Jie, Shen Yao
    [J]. PROCEEDINGS OF THE 2011 INTERNATIONAL CONFERENCE ON INFORMATICS, CYBERNETICS, AND COMPUTER ENGINEERING (ICCE2011), VOL 3: COMPUTER NETWORKS AND ELECTRONIC ENGINEERING, 2011, 112 : 647 - 653
  • [6] A Research Review of Project Risk Assessment Methods
    Chen Zhicheng
    Yao Lu
    Yang Jianjun
    [J]. FRONTIERS OF MANUFACTURING AND DESIGN SCIENCE IV, PTS 1-5, 2014, 496-500 : 2857 - 2862
  • [7] RESEARCH INTO SPECIFIC RISK ASSESSMENT IN PROJECT FINANCING
    Bukvic, Ivana Bestvina
    [J]. EKONOMSKI VJESNIK, 2013, 26 (02): : 481 - 494
  • [8] Research on Operational Safety Risk Assessment Method for Long and Large Highway Tunnels Based on FAHP and SPA
    Zhao, Yifei
    Qiu, Rui
    Chen, Min
    Xiao, Shan
    [J]. APPLIED SCIENCES-BASEL, 2023, 13 (16):
  • [9] Risk Assessment Model on the Internal corporate governance Based on the SPA
    Ma, Jibin
    Gu, Huiling
    Sun, Yonghao
    Hu, Xujie
    [J]. FIFTH INTERNATIONAL CONFERENCE ON INFORMATION ASSURANCE AND SECURITY, VOL 2, PROCEEDINGS, 2009, : 272 - +
  • [10] Research on Software Project Risk Assessment Model based on Fuzzy Theory and Improved
    Yu, Zhenyu
    Yang, Kun
    Luo, Yi
    Deng, Qiongfei
    [J]. 2017 IEEE 2ND ADVANCED INFORMATION TECHNOLOGY, ELECTRONIC AND AUTOMATION CONTROL CONFERENCE (IAEAC), 2017, : 2073 - 2077