Research on the Risk Assessment of Railway Engineering Project Based on FAHP Model

被引:0
|
作者
Li, Suying [1 ]
Tian, Ya [2 ]
Wu, Yongli [2 ]
机构
[1] Shijiazhuang Tiedao University, Shijiazhuang,Hebei,050043, China
[2] Hebei Normal University, Shijiazhuang,Hebei,050024, China
关键词
Analytic hierarchy process (ahp) - Fuzzy comprehensive evaluation method - High - speed railways - Project risk assessment - Railway construction - Railway engineering - Risk assessment models - Technical requirement;
D O I
暂无
中图分类号
学科分类号
摘要
10
引用
收藏
页码:92 / 99
相关论文
共 50 条
  • [1] Research on Security Risk Assessment Based on the Improved FAHP
    Li, Wenmin
    Liang, Ye
    Wang, Wenyu
    Jin, Xueqi
    Kong, Piaohong
    Jiang, Zhengwei
    Shao, Lisong
    [J]. 3RD ANNUAL INTERNATIONAL CONFERENCE ON CLOUD TECHNOLOGY AND COMMUNICATION ENGINEERING, 2020, 719
  • [2] Research on the Risk Assessment of Engineering Project Based on Grey Theory and Fuzzy Mathematics
    Zhang Tiefu
    Yan Jun
    Zhang Xing
    Peng Dahai
    [J]. 2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 10724 - +
  • [3] Research on the Application of Railway Engineering Project Management System Based on BIM
    Zhang, Yi
    Huang, Congzhi
    Zhu, Cong
    [J]. Journal of Railway Engineering Society, 2019, 36 (09): : 98 - 103
  • [4] Engineering Project Risk Evaluation System Construction and Research Based on BP Model
    Zhang Jianwei
    Ye Donglu
    Ye Guanchan
    Zhou Jingzhi
    [J]. FRONTIERS OF GREEN BUILDING, MATERIALS AND CIVIL ENGINEERING III, PTS 1-3, 2013, 368-370 : 2050 - +
  • [5] Risk Evaluation Research and Model Building Based on ANP for BT Engineering Project
    Zhang Jianwei
    Reng Guangfei
    Li Zhenqing
    Li Jun
    [J]. FRONTIERS OF GREEN BUILDING, MATERIALS AND CIVIL ENGINEERING III, PTS 1-3, 2013, 368-370 : 1950 - +
  • [6] Research on the Evaluation Model of Bidding Risk in Engineering Project
    Liu, Bao-kun
    Wang, Peng
    [J]. MATERIALS SCIENCE AND INFORMATION TECHNOLOGY, PTS 1-8, 2012, 433-440 : 2244 - 2249
  • [7] Research of project risk assessment based on SPA
    Liu, Jun'e
    Lu, Rongrong
    Guo, Zhanglin
    [J]. PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON RISK AND RELIABILITY MANAGEMENT, VOLS I AND II, 2008, : 392 - 395
  • [8] Business process re-engineering risk assessment Based on a new improved FAHP
    He, Yonggui
    Jiang, Lianfu
    Li, Bo
    [J]. 2009 ASIA-PACIFIC CONFERENCE ON INFORMATION PROCESSING (APCIP 2009), VOL 2, PROCEEDINGS, 2009, : 278 - 281
  • [9] Research on Software Project Risk Assessment Model based on Fuzzy Theory and Improved
    Yu, Zhenyu
    Yang, Kun
    Luo, Yi
    Deng, Qiongfei
    [J]. 2017 IEEE 2ND ADVANCED INFORMATION TECHNOLOGY, ELECTRONIC AND AUTOMATION CONTROL CONFERENCE (IAEAC), 2017, : 2073 - 2077
  • [10] The risk assessment model of BT construction engineering project financing
    Luo Fu-zhou
    Gao Hong-yuan
    [J]. ENGINEERING AND RISK MANAGEMENT, 2011, 1 : 169 - 173