Research on the Risk Assessment of Railway Engineering Project Based on FAHP Model

被引:0
|
作者
Li, Suying [1 ]
Tian, Ya [2 ]
Wu, Yongli [2 ]
机构
[1] Shijiazhuang Tiedao University, Shijiazhuang,Hebei,050043, China
[2] Hebei Normal University, Shijiazhuang,Hebei,050024, China
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:92 / 99
相关论文
共 50 条
  • [31] Construction of Risk Pressure Model in Engineering Project and Research on Enhancement of Human Resources Performance An Analysis Based on Pressure Model
    Yan Shumin
    Zhang Nasi
    [J]. 2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 10567 - 10571
  • [32] Research on Consumer Credit Assessment of Power Enterprises based on FAHP
    Jia, Zhengyuan
    Huang, Zhiwei
    [J]. AUTOMATION EQUIPMENT AND SYSTEMS, PTS 1-4, 2012, 468-471 : 3020 - 3023
  • [33] Research on Risk Management of Engineering Project Auction
    Fang Debin
    Liu Wen
    [J]. ADVANCED RESEARCH ON INFORMATION SCIENCE, AUTOMATION AND MATERIAL SYSTEM, PTS 1-6, 2011, 219-220 : 1523 - 1527
  • [34] The Model Combined the BT Project And Land Development Risk Assessment Research
    Yuan Hai-lin
    Cai Wen-ying
    [J]. ENGINEERING AND RISK MANAGEMENT, 2011, 1 : 250 - 256
  • [35] Research on the Risk Assessment Model in Construction Project's Life Cycle
    Lai Yu
    Luo Fuzhou
    [J]. PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON SUSTAINABLE CONSTRUCTION & RISK MANAGEMENT, VOLS I AND II, 2010, : 52 - 55
  • [36] Research on Operational Safety Risk Assessment Method for Long and Large Highway Tunnels Based on FAHP and SPA
    Zhao, Yifei
    Qiu, Rui
    Chen, Min
    Xiao, Shan
    [J]. APPLIED SCIENCES-BASEL, 2023, 13 (16):
  • [37] A Model of Risk Assessment of Software Project Based on Grey Theory
    Pang Qinghua
    [J]. ICCSSE 2009: PROCEEDINGS OF 2009 4TH INTERNATIONAL CONFERENCE ON COMPUTER SCIENCE & EDUCATION, 2009, : 538 - 541
  • [38] Fuzzy Probability Method-Based Risk Assessment of International Engineering Project
    Liu, Zhangjun
    Kong, Ya
    [J]. ADVANCES IN CIVIL ENGINEERING AND ARCHITECTURE INNOVATION, PTS 1-6, 2012, 368-373 : 3180 - 3183
  • [39] Progress Risk Assessment for Spliced Network of Engineering Project Based on Improved PERT
    Li Wenying
    Liu Xiaojun
    [J]. ENGINEERING AND RISK MANAGEMENT, 2011, 1 : 271 - 278
  • [40] RISK IDENTIFICATION METHOD FOR ENGINEERING DESIGN PROJECT BASED ON RISK CHAIN MECHANISM MODEL
    Nomaguchi, Yutaka
    Dong, Chunzhi
    Nakashima, Hirotaka
    Fujita, Kikuo
    [J]. INTERNATIONAL DESIGN ENGINEERING TECHNICAL CONFERENCES AND COMPUTERS AND INFORMATION IN ENGINEERING CONFERENCE, 2015, VOL 4, 2016,