Construction of Risk Pressure Model in Engineering Project and Research on Enhancement of Human Resources Performance An Analysis Based on Pressure Model

被引:0
|
作者
Yan Shumin [1 ]
Zhang Nasi [1 ]
机构
[1] Tongji Univ, Sch Econ & Management, Shanghai 200092, Peoples R China
关键词
Pressure model; engineering project risks; human performance enchancement;
D O I
暂无
中图分类号
TN [电子技术、通信技术];
学科分类号
0809 ;
摘要
Risk management is one of the most important management factors which affect the smooth implementation of an engineering project. This article, based on relevant theories in respect of engineering project risk types and pressure gauge instrument structure principles, analyzes the engineering project risk pressure system. According to the analysis, the reason why the same risk factors action causes different risk rates is the different capability of engineering projects to buffer risk pressure. By establishing and analyzing an engineering project risk pressure model, we rind that, human resource has similar characteristics as elastic sensitive units to affect engineering project risk pressure. Moreover, this article discusses key capabilities in different stages of engineering projects and furthermore puts forward several measures to promote the level A of risk management.
引用
收藏
页码:10567 / 10571
页数:5
相关论文
共 50 条
  • [1] Engineering Project Risk Evaluation System Construction and Research Based on BP Model
    Zhang Jianwei
    Ye Donglu
    Ye Guanchan
    Zhou Jingzhi
    [J]. FRONTIERS OF GREEN BUILDING, MATERIALS AND CIVIL ENGINEERING III, PTS 1-3, 2013, 368-370 : 2050 - +
  • [2] Research in the Risk Control Model of Construction Project Based on Uncertain Theory
    Lin, Feng
    Guan, Jianping
    [J]. PROCEEDINGS OF 2011 INTERNATIONAL CONFERENCE ON INFORMATION TECHNOLOGY AND INDUSTRIAL ENGINEERING, 2011, : 93 - 96
  • [3] Research on the Risk Assessment of Railway Engineering Project Based on FAHP Model
    Li, Suying
    Tian, Ya
    Wu, Yongli
    [J]. Journal of Railway Engineering Society, 2019, 36 (07) : 92 - 99
  • [4] THE CONSTRUCTION OF A NEW INDUSTRY UNIVERSITY RESEARCH MODEL TO ALLEVIATE THE PSYCHOLOGICAL PRESSURE OF ENGINEERING STUDENTS
    Li, Wei
    [J]. MEDICINE, 2024, 103 (14)
  • [5] Research on the Construction of Three Levels of Customization Model Based on Human Engineering
    An, Weijin
    Yang, Wenming
    [J]. ADVANCES IN ENGINEERING DESIGN AND OPTIMIZATION, PTS 1 AND 2, 2011, 37-38 : 1088 - +
  • [6] Research on relationships model of organization communication performance of the construction project based on shared mental model
    Wang, Yujie
    Liu, Guoliang
    [J]. 2009 INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT, INNOVATION MANAGEMENT AND INDUSTRIAL ENGINEERING, VOL 1, PROCEEDINGS, 2009, : 208 - 211
  • [7] Research on the Evaluation Model of Bidding Risk in Engineering Project
    Liu, Bao-kun
    Wang, Peng
    [J]. MATERIALS SCIENCE AND INFORMATION TECHNOLOGY, PTS 1-8, 2012, 433-440 : 2244 - 2249
  • [8] The risk assessment model of BT construction engineering project financing
    Luo Fu-zhou
    Gao Hong-yuan
    [J]. ENGINEERING AND RISK MANAGEMENT, 2011, 1 : 169 - 173
  • [9] Research on equilibrium model of risk allocation in construction project based on game theory
    Zhang, EW
    Li, QM
    Deng, XP
    [J]. PROCEEDINGS OF THE 2004 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, 2004, : 253 - 256
  • [10] Risk Evaluation Research and Model Building Based on ANP for BT Engineering Project
    Zhang Jianwei
    Reng Guangfei
    Li Zhenqing
    Li Jun
    [J]. FRONTIERS OF GREEN BUILDING, MATERIALS AND CIVIL ENGINEERING III, PTS 1-3, 2013, 368-370 : 1950 - +