共 50 条
- [41] Research on Risk Evaluation of Hydropower Engineering EPC Project Based on Improved Fuzzy Evidence Reasoning Model [J]. SYSTEMS, 2023, 11 (07):
- [42] Construction project network evaluation with correlated schedule risk analysis model [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2008, 134 (01): : 49 - 63
- [43] A risk-cost optimization model for selecting human resources in construction projects [J]. SN Applied Sciences, 2019, 1
- [45] Model analysis of engineering project process based on Coxian distribution [J]. 2022 PROGNOSTICS AND HEALTH MANAGEMENT CONFERENCE, PHM-LONDON 2022, 2022, : 108 - 112
- [47] The Public Human Resources Development Research based on Competency Model [J]. PROCEEDINGS OF 2014 INTERNATIONAL CONFERENCE ON PUBLIC ADMINISTRATION (10TH), VOL I, 2014, : 937 - 942
- [49] System dynamic model applying on analysis of impact of schedule pressure on project [J]. FOURTH INTERNATIONAL CONFERENCE ON FUZZY SYSTEMS AND KNOWLEDGE DISCOVERY, VOL 4, PROCEEDINGS, 2007, : 508 - 513
- [50] POP: A Data-Based Construction Project Overall Performance Model [J]. CONSTRUCTION RESEARCH CONGRESS 2022: PROJECT MANAGEMENT AND DELIVERY, CONTRACTS, AND DESIGN AND MATERIALS, 2022, : 734 - 743