Research of project risk assessment based on SPA

被引:0
|
作者
Liu, Jun'e [1 ]
Lu, Rongrong [1 ]
Guo, Zhanglin [1 ]
机构
[1] Beijing Wuzi Univ, Informat Sch, Beijing 101149, Peoples R China
关键词
SPA; risk management; the correlation coefficient;
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
The project risk management is playing a more important role in the project management. In this article, the method of SPA is used in the project risk management. Through analyzing the certain and uncertain factors in a project, the system's risk is assessed by set pair analysis. The safety and danger are the opposite factors which could become a set pair. According to analysis of the set pair of the Salem-danger factors, correlation coefficient will be determined, And at the same time, it can express the system's risk rank. For avoiding the risk of the project, the corresponding measures should be taken to protect the project. Using the set pair analysis method, the result of the project's risk assessment is simple and reasonable, and the information is used effectively.
引用
收藏
页码:392 / 395
页数:4
相关论文
共 50 条
  • [41] A simulation-based risk interdependency network model for project risk assessment
    Guan, Li
    Abbasi, Alireza
    Ryan, Michael J.
    [J]. DECISION SUPPORT SYSTEMS, 2021, 148
  • [42] Model design of project risk assessment based on cloud theory
    School of Economics and Management, Beijing University of Aeronautics and Astronautics, Beijing 100191, China
    [J]. Beijing Hangkong Hangtian Daxue Xuebao, 2008, 12 (1445-1447):
  • [43] Risk Assessment on Tender for International Petroleum Project Based on FHW
    Wang, Jiashan
    Haiyan Jin
    [J]. EIGHTH WUHAN INTERNATIONAL CONFERENCE ON E-BUSINESS, VOLS I-III, 2009, : 2072 - 2077
  • [44] Safety Risk Assessment of Power Construction Project Based on the Vulnerability
    Yang, Taihua
    Zheng, Qinghua
    Wang, Yang
    Liu, Rui
    [J]. 2ND INTERNATIONAL CONFERENCE ON NEW ENERGY AND RENEWABLE RESOURCES (ICNERR 2017), 2017, : 108 - 112
  • [45] A Model of Risk Assessment of Software Project Based on Grey Theory
    Pang Qinghua
    [J]. ICCSSE 2009: PROCEEDINGS OF 2009 4TH INTERNATIONAL CONFERENCE ON COMPUTER SCIENCE & EDUCATION, 2009, : 538 - 541
  • [46] Simulator for Risk Assessment of Software Project based on Performance Measurement
    Suri, P. K.
    Bhushan, Bharat
    Jolly, Ashish
    [J]. INTERNATIONAL JOURNAL OF COMPUTER SCIENCE AND NETWORK SECURITY, 2009, 9 (06): : 23 - 29
  • [47] Research on the Project Risk Management Process Based on the Process Method
    Liang Xiaoqin
    Hong Shicong
    [J]. SPORTS MATERIALS, MODELLING AND SIMULATION, 2011, 187 : 23 - +
  • [48] Research on Project Risk Evaluation Method Based on Bayesian Networks
    Yang, X.
    [J]. INTERNATIONAL CONFERENCE ON ADVANCED EDUCATIONAL TECHNOLOGY AND INFORMATION ENGINEERING (AETIE 2015), 2015, : 1017 - 1023
  • [49] Research of Project Risk Decision and Control Based on Dynamic Management
    Ma Lihua
    [J]. 2009 2ND IEEE INTERNATIONAL CONFERENCE ON COMPUTER SCIENCE AND INFORMATION TECHNOLOGY, VOL 4, 2009, : 334 - 337
  • [50] Risk Sharing Research of Construction Project Based on Entropy Weight
    Zhang Yi
    Wang Zhuo-fu
    [J]. PROCEEDINGS OF 2009 INTERNATIONAL CONFERENCE OF MANAGEMENT SCIENCE AND INFORMATION SYSTEM, VOLS 1-4, 2009, : 689 - 691