Research of project risk assessment based on SPA

被引:0
|
作者
Liu, Jun'e [1 ]
Lu, Rongrong [1 ]
Guo, Zhanglin [1 ]
机构
[1] Beijing Wuzi Univ, Informat Sch, Beijing 101149, Peoples R China
关键词
SPA; risk management; the correlation coefficient;
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
The project risk management is playing a more important role in the project management. In this article, the method of SPA is used in the project risk management. Through analyzing the certain and uncertain factors in a project, the system's risk is assessed by set pair analysis. The safety and danger are the opposite factors which could become a set pair. According to analysis of the set pair of the Salem-danger factors, correlation coefficient will be determined, And at the same time, it can express the system's risk rank. For avoiding the risk of the project, the corresponding measures should be taken to protect the project. Using the set pair analysis method, the result of the project's risk assessment is simple and reasonable, and the information is used effectively.
引用
下载
收藏
页码:392 / 395
页数:4
相关论文
共 50 条
  • [11] Research on the Risk Assessment of Engineering Project Based on Grey Theory and Fuzzy Mathematics
    Zhang Tiefu
    Yan Jun
    Zhang Xing
    Peng Dahai
    2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 10724 - +
  • [12] Research on Risk Assessment of Disaster Prevention Project based on Triangle Fuzzy Number
    Zhang Zhiguo
    DISASTER ADVANCES, 2012, 5 (04): : 1072 - 1075
  • [13] Research on the Project Critical Activity Uncertainty Risk Assessment
    Xin, Zi-ling
    Pan, Xing
    2014 60TH ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM (RAMS), 2014,
  • [14] Research on Electronic Project Investment Risk Assessment Methods
    Yu, Jike
    Li, Yunfei
    Yang, Yang
    Zhou, Zongfang
    CHINESE PERSPECTIVE ON RISK ANALYSIS AND CRISIS RESPONSE, 2010, 13 : 982 - 987
  • [15] Research on Risk Assessment of Port Project Investment and Construction
    Xu, Xiaoyang
    Yang, Zhengrong
    Jin, Lifu
    Hao, Lizhong
    JOURNAL OF COASTAL RESEARCH, 2020, : 187 - 189
  • [16] Research on Risk Assessment of Coalbed Methane Development Project Based on SEWM-GCA
    Wang, Wanqing
    Lyu, Shuran
    Zhang, Yudong
    Ma, Shuqi
    5TH INTERNATIONAL CONFERENCE ON ADVANCES IN ENERGY, ENVIRONMENT AND CHEMICAL ENGINEERING, 2019, 358
  • [17] Research on Two-Stage Model of Project Risk Assessment Based on Knowledge Discovery
    Zhang, Liwei
    Zhao, Dandan
    PROCEEDINGS OF THE 2015 INTERNATIONAL SYMPOSIUM ON COMPUTERS & INFORMATICS, 2015, 13 : 1398 - 1404
  • [18] Research on the risk assessment method of PPP project based on the improved matter element model
    Liu, B.
    Sun, F-H
    SCIENTIA IRANICA, 2020, 27 (02) : 614 - 624
  • [19] Principles of assessment for project and research based learning
    Hunaiti, Ziad
    Grimaldi, Silvia
    Goven, Dharmendra
    Mootanah, Rajshree
    Martin, Louise
    INTERNATIONAL JOURNAL OF EDUCATIONAL MANAGEMENT, 2010, 24 (03) : 189 - 203
  • [20] The Project Cost Risk Assessment Based On AHP
    Qian, Huachao
    Wang, Qi
    Liu, Xiaowen
    PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL TECHNOLOGY AND MANAGEMENT SCIENCE (ITMS 2015), 2015, 34 : 1189 - 1191