共 50 条
- [1] The effects of purchased parts commonality on manufacturing lead time International Journal of Operations & Production Management, 17 (7-8):
- [5] Quality assurance program for purchased parts FUJITSU SCIENTIFIC & TECHNICAL JOURNAL, 2008, 44 (02): : 176 - 182
- [6] A multi-period inventory model of component commonality with lead time 2006 IEEE INTERNATIONAL CONFERENCE ON SERVICE OPERATIONS AND LOGISTICS, AND INFORMATICS (SOLI 2006), PROCEEDINGS, 2006, : 352 - +
- [7] THE EFFECT OF COMMONALITY ON THE MANAGEMENT OF SERVICE PARTS .1. THE EFFECT OF COMMONALITY ON FORECASTING THE FUTURE DEMANDS OF SERVICE PARTS BULLETIN OF THE JAPAN SOCIETY OF PRECISION ENGINEERING, 1989, 23 (04): : 266 - 271
- [10] Flexible manufacturing system cuts lead times for missile launcher parts AIRCRAFT ENGINEERING AND AEROSPACE TECHNOLOGY, 2002, 74 (01): : 71 - 73