The effects of purchased parts commonality on manufacturing lead time

被引:27
|
作者
Sheu, C [1 ]
Wacker, JG [1 ]
机构
[1] IOWA STATE UNIV,COLL BUSINESS ADM,AMES,IA 50011
关键词
manufacturing lead times; product design; product structure;
D O I
10.1108/01443579710175529
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Manufacturing managers as well as researchers suggest that reducing manufacturing lead time is essential for competing in world-class manufacturing environments. To achieve world-class manufacturing status, organizations implement a variety of programmes to decrease manufacturing lead time. Uses simulation to analyse the effect of purchased parts standardization on manufacturing lead time under the assumption of limited vendor delivery uncertainty. Creates a wide range of degrees of commonality based on three sets of multilevel product structures with the variations of end-item demand and quantity usage. The statistical results indicate that: increased commonality lowers manufacturing lead time; a more informative commonality measure other than the well-known degree of commonality index (DCI) is necessary to represent the actual commonality; and the distribution of purchased parts usage across different end items affects manufacturing lead time performance. The results provide important implications for both manufacturing and product design management.
引用
下载
收藏
页码:725 / &
页数:22
相关论文
共 50 条
  • [41] The Context Between the Shift of Average Demand and the Safety Stock of Purchased Parts
    Korponai, Janos
    Toth, Agota Banyaine
    Illes, Bela
    VEHICLE AND AUTOMOTIVE ENGINEERING, 2017, : 275 - 285
  • [42] PARTS ROUTING IN A FLEXIBLE MANUFACTURING SYSTEM WITH TIME-VARYING DEMANDS
    CHEN, MY
    ALFA, AS
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1992, 60 (02) : 224 - 232
  • [43] Laser-based technology offers time savings for parts manufacturing
    Ajluni, C
    ELECTRONIC DESIGN, 1998, 46 (02) : 38 - 38
  • [44] Fuzzy Logic Control for Varied Inspection for Manufacturing Lead Time Reduction A Fuzzy Control Implementation of a Dynamic Inspection Technique to Reduce Manufacturing Lead Time
    Naidoo, Trishen
    Walker, Anthony
    Bright, Glen
    Davrajh, Shaniel
    ICINCO: PROCEEDINGS OF THE 14TH INTERNATIONAL CONFERENCE ON INFORMATICS IN CONTROL, AUTOMATION AND ROBOTICS - VOL 1, 2017, : 207 - 214
  • [45] Manufacturing lead times, system utilization rates and lead-time-related demand
    Weng, ZK
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 89 (02) : 259 - 268
  • [46] Automated Lead Time Estimation for Manufacturing Networks with Dynamic Demand
    Askin, Ronald G.
    Hanumantha, Girish Jampani
    2017 13TH IEEE CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING (CASE), 2017, : 994 - 999
  • [47] Influence of Manufacturing Process Modularity on Lead Time Performances and Complexity
    Modrak, Vladimir
    Soltysova, Zuzana
    APPLIED SCIENCES-BASEL, 2023, 13 (12):
  • [48] Lead Time Prediction Using Simulation in Leather Shoe Manufacturing
    Solomon, Hermela
    Jilcha, Kassu
    Berhan, Eshetie
    AFRO-EUROPEAN CONFERENCE FOR INDUSTRIAL ADVANCEMENT, AECIA 2014, 2015, 334 : 283 - 292
  • [49] Lead-time reduction in manufacturing - from initiation to realization
    Wedel, John E.
    Doktorsavhandlingar vid Chalmers Tekniska Hogskola, 1996, (1209):
  • [50] Analysis of the Lead Time Distribution in Closed Loop Manufacturing Systems
    Angius, Alessio
    Colledani, Marcello
    Horvath, Andras
    Gershwin, StanleyB.
    IFAC PAPERSONLINE, 2016, 49 (12): : 307 - 312