The effects of purchased parts commonality on manufacturing lead time

被引:27
|
作者
Sheu, C [1 ]
Wacker, JG [1 ]
机构
[1] IOWA STATE UNIV,COLL BUSINESS ADM,AMES,IA 50011
关键词
manufacturing lead times; product design; product structure;
D O I
10.1108/01443579710175529
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Manufacturing managers as well as researchers suggest that reducing manufacturing lead time is essential for competing in world-class manufacturing environments. To achieve world-class manufacturing status, organizations implement a variety of programmes to decrease manufacturing lead time. Uses simulation to analyse the effect of purchased parts standardization on manufacturing lead time under the assumption of limited vendor delivery uncertainty. Creates a wide range of degrees of commonality based on three sets of multilevel product structures with the variations of end-item demand and quantity usage. The statistical results indicate that: increased commonality lowers manufacturing lead time; a more informative commonality measure other than the well-known degree of commonality index (DCI) is necessary to represent the actual commonality; and the distribution of purchased parts usage across different end items affects manufacturing lead time performance. The results provide important implications for both manufacturing and product design management.
引用
收藏
页码:725 / &
页数:22
相关论文
共 50 条
  • [31] Production lead time improvement through lean manufacturing
    Gebeyehu, Sisay G.
    Abebe, Muluken
    Gochel, Amdework
    COGENT ENGINEERING, 2022, 9 (01):
  • [32] Component commonality in closed-loop manufacturing systems
    Su, Jack C. P.
    Lin, Yun Chiao
    Lee, Victor
    JOURNAL OF INTELLIGENT MANUFACTURING, 2012, 23 (06) : 2383 - 2396
  • [33] Component commonality in closed-loop manufacturing systems
    Jack C. P. Su
    Yun Chiao Lin
    Victor Lee
    Journal of Intelligent Manufacturing, 2012, 23 : 2383 - 2396
  • [34] Commonality in manufacturing resources planning - issues and models: a review
    Wazed, Md Abdul
    Ahmed, Shamsuddin
    Nukman, Yusoff
    EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2010, 4 (02) : 167 - 188
  • [35] Transportation mode selection with positive manufacturing lead time
    Kiesmüller, GP
    de Kok, AG
    Fransoo, JC
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2005, 41 (06) : 511 - 530
  • [36] Monitoring processes through inventory and manufacturing lead time
    Cuatrecasas-Arbos, Lluis
    Fortuny-Santos, Jordi
    Ruiz-de-Arbulo-Lopez, Patxi
    Vintro-Sanchez, Carla
    INDUSTRIAL MANAGEMENT & DATA SYSTEMS, 2015, 115 (05) : 951 - 970
  • [37] Manufacturing lead time estimation using data mining
    Ozturk, Atakan
    Kayaligil, Sinan
    Ozdemirel, Nur E.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 173 (02) : 683 - 700
  • [38] The differences of electrochemical performance between the purchased lead carbonate and the prepared lead carbonate
    BAO You-Fu (Zhejiang Narada Power Source Co.
    电池工业, 2005, (04) : 212 - 216
  • [39] A digital twin for composite parts manufacturing Effects of defects analysis based on manufacturing data
    Zambal, Sebastian
    Eitzinger, Christian
    Clarke, Michael
    Klintworth, John
    Mechin, Pierre-Yves
    2018 IEEE 16TH INTERNATIONAL CONFERENCE ON INDUSTRIAL INFORMATICS (INDIN), 2018, : 803 - 808
  • [40] Vendor Managed Inventory on Two Echelon Inventory System with Optimum Accelerated Lead Time and Component Commonality
    Hidayat, Y. A.
    Simatupang, T.
    Sebrina
    Ariansyah, M. N.
    Sembada, W. J.
    2017 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2017, : 1382 - 1386