The effects of purchased parts commonality on manufacturing lead time

被引:27
|
作者
Sheu, C [1 ]
Wacker, JG [1 ]
机构
[1] IOWA STATE UNIV,COLL BUSINESS ADM,AMES,IA 50011
关键词
manufacturing lead times; product design; product structure;
D O I
10.1108/01443579710175529
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Manufacturing managers as well as researchers suggest that reducing manufacturing lead time is essential for competing in world-class manufacturing environments. To achieve world-class manufacturing status, organizations implement a variety of programmes to decrease manufacturing lead time. Uses simulation to analyse the effect of purchased parts standardization on manufacturing lead time under the assumption of limited vendor delivery uncertainty. Creates a wide range of degrees of commonality based on three sets of multilevel product structures with the variations of end-item demand and quantity usage. The statistical results indicate that: increased commonality lowers manufacturing lead time; a more informative commonality measure other than the well-known degree of commonality index (DCI) is necessary to represent the actual commonality; and the distribution of purchased parts usage across different end items affects manufacturing lead time performance. The results provide important implications for both manufacturing and product design management.
引用
下载
收藏
页码:725 / &
页数:22
相关论文
共 50 条
  • [21] Purchased energy and policy impacts in the US manufacturing sector
    Horowitz, Marvin J.
    ENERGY EFFICIENCY, 2014, 7 (01) : 65 - 77
  • [22] Impact of commonality and flexibility on manufacturing performance: A simulation study
    Nagarur, N
    Azeem, A
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1999, 60-1 : 125 - 134
  • [23] Disassembly scheduling with parts commonality using petri nets with timestamps
    Neuendorf, KP
    Lee, DH
    Kiritsis, D
    Xirouchakis, P
    FUNDAMENTA INFORMATICAE, 2001, 47 (3-4) : 295 - 306
  • [24] Purchased energy and policy impacts in the US manufacturing sector
    Marvin J. Horowitz
    Energy Efficiency, 2014, 7 : 65 - 77
  • [25] Effect of commonality on spare parts provisioning costs for capital goods
    Kranenburg, A. A.
    Van Houtum, G. J.
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2007, 108 (1-2) : 221 - 227
  • [26] Cost effect of component commonality:: Manufacturing cost perspective
    Lyly-Yrjanainen, Jouni
    Lahikainen, Tommi
    Paranko, Jari
    PROCEEDINGS OF NORDDESIGN 2004: PRODUCT DEVELOPMENT IN CHANGING ENVIRONMENT, 2004, : 371 - 380
  • [27] Mathematical Analysis of Manufacturing Lead Time: Applications to Deadline Scheduling in Manufacturing Systems
    Shirai, Kenji
    Amano, Yoshinori
    ELECTRONICS AND COMMUNICATIONS IN JAPAN, 2014, 97 (12) : 24 - 34
  • [28] On the Importance of Service Parts When Taking Commonality and Reliability Decisions
    Driessen, Joni
    Arts, Joachim
    van Houtum, Geert-Jan
    SERVICE SCIENCE, 2024, 16 (03)
  • [29] Disassembly scheduling with parts commonality using Petri nets with timestamps
    Neuendorf, K.-P.
    Lee, D.-H.
    Kiritsis, D.
    Xirouchakis, P.
    2001, IOS Press (47) : 3 - 4
  • [30] Production lead time improvement through lean manufacturing
    Gochel, Amdework
    Gebeyehu, Sisay G.
    Abebe, Muluken
    International Journal of Industrial and Systems Engineering, 2022, 40 (02) : 147 - 156