Flexible manufacturing system cuts lead times for missile launcher parts

被引:0
|
作者
不详
机构
来源
关键词
aircraft; military; missiles;
D O I
暂无
中图分类号
V [航空、航天];
学科分类号
08 ; 0825 ;
摘要
引用
收藏
页码:71 / 73
页数:3
相关论文
共 50 条
  • [1] INSPECTION OF AN UNRELIABLE FLEXIBLE MANUFACTURING SYSTEM - WITH REPAIRABLE PARTS AND NONNEGLIGIBLE INSPECTION TIMES
    HSU, LF
    TAPIERO, CS
    [J]. PRODUCTION PLANNING & CONTROL, 1994, 5 (04) : 360 - 371
  • [2] LXI test system for missile launcher
    Bloennigen, Fred
    [J]. EE: Evaluation Engineering, 2013, 52 (09):
  • [3] Modeling and verification of a missile launcher system
    Isik, C.
    Ider, S. K.
    Acar, B.
    [J]. PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART K-JOURNAL OF MULTI-BODY DYNAMICS, 2014, 228 (01) : 100 - 107
  • [4] CAD CUTS LEAD TIMES
    不详
    [J]. ENGINEERING, 1981, 221 (04): : 319 - 319
  • [6] Standardizing parts cuts mold times in half
    [J]. Design News (Boston), 1994, 49 (18):
  • [7] Dynamic simulation analysis of rigid-flexible coupling of a missile launcher
    Yao J.
    Wang X.
    Liu N.
    Mei Y.
    Wu Y.
    Yu G.
    [J]. Harbin Gongcheng Daxue Xuebao/Journal of Harbin Engineering University, 2022, 43 (10): : 1491 - 1498
  • [8] Manufacturing - Microwaving cuts cost of jet parts
    不详
    [J]. CHEMISTRY & INDUSTRY, 2003, (20) : 8 - 8
  • [9] Optimal Control Synthesis for a Flexible Manufacturing System Based on Minimal Cuts
    Rezig, S.
    Achour, Z.
    Rezg, N.
    Kammoun, M-A.
    [J]. 2014 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2014, : 254 - 258
  • [10] Robot tracks parts, cuts cycle times by 10%
    [J]. Mod Plast, 10 (54):