Two continuous-time assignment-based models for the multi-mode resource-constrained project scheduling problem

被引:11
|
作者
Gnaegi, Mario [1 ]
Rihm, Tom [1 ]
Zimmermann, Adrian [1 ]
Trautmann, Norbert [1 ]
机构
[1] Univ Bern, Dept Business Adm, Schuetzenmattstr 14, CH-3012 Bern, Switzerland
关键词
Operations research; Mixed-integer linear programming; Multi-mode resource-constrained project scheduling; FORMULATIONS;
D O I
10.1016/j.cie.2019.01.033
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In the multi-mode resource-constrained project scheduling problem, a set of precedence-related project activities and, for each activity, a set of alternative execution modes are given. Each activity requires some time and some scarce resources during execution; these requirements depend on the selected execution mode. Sought is a project schedule, i.e, a start time and an execution mode for each activity, such that the project makespan is minimized. In the literature, besides a large variety of specific solution approaches, several Mixed-Integer Linear Programming (MILP) models have been proposed for this problem. We present two novel MILP models that are based on mode-selection, resource-assignment and sequencing variables; we enhance the performance of the models by eliminating some symmetric solutions from the search space and by adding some redundant sequencing constraints for pairs and for triples of activities that cannot be processed in parallel. In a comparison with reference models from the literature, it turned out that the advantages of the novel models are a simple structure, an enhanced flexibility, and a superior performance when the range of the activities' durations is relatively large.
引用
收藏
页码:346 / 353
页数:8
相关论文
共 50 条
  • [21] Optimizing time, cost and quality in multi-mode resource-constrained project scheduling
    Kannimuthu, Marimuthu
    Raphael, Benny
    Palaneeswaran, Ekambaram
    Kuppuswamy, Ananthanarayanan
    BUILT ENVIRONMENT PROJECT AND ASSET MANAGEMENT, 2019, 9 (01) : 44 - 63
  • [22] Simulated annealing for multi-mode resource-constrained project scheduling
    Józefowska, J
    Mika, M
    Rózycki, R
    Waligóra, G
    Weglarz, J
    ANNALS OF OPERATIONS RESEARCH, 2001, 102 (1-4) : 137 - 155
  • [23] Modelling and Solving Multi-mode Resource-Constrained Project Scheduling
    Szeredi, Ria
    Schutt, Andreas
    PRINCIPLES AND PRACTICE OF CONSTRAINT PROGRAMMING, CP 2016, 2016, 9892 : 483 - 492
  • [24] Hybrid Heuristics for Multi-mode Resource-Constrained Project Scheduling
    Tchao, Celso
    Martins, Simone L.
    LEARNING AND INTELLIGENT OPTIMIZATION, 2008, 5313 : 234 - +
  • [25] Using resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problem
    Vincent Van Peteghem
    Mario Vanhoucke
    Journal of Heuristics, 2011, 17 : 705 - 728
  • [26] Using resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problem
    Van Peteghem, Vincent
    Vanhoucke, Mario
    JOURNAL OF HEURISTICS, 2011, 17 (06) : 705 - 728
  • [27] A Continuous-Time Unit-Based MILP Formulation for the Resource-Constrained Project Scheduling Problem
    Gnagi, M.
    Zimmermann, A.
    Trautmann, N.
    2018 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEE IEEM), 2018, : 432 - 436
  • [28] An effective estimation of distribution algorithm for the multi-mode resource-constrained project scheduling problem
    Wang, Ling
    Fang, Chen
    COMPUTERS & OPERATIONS RESEARCH, 2012, 39 (02) : 449 - 460
  • [29] A Path-Relinking algorithm for the multi-mode resource-constrained project scheduling problem
    Fernandes Muritiba, Albert Einstein
    Rodrigues, Carlos Diego
    da Costa, Franciio Araujo
    COMPUTERS & OPERATIONS RESEARCH, 2018, 92 : 145 - 154
  • [30] An automatic algorithm selection approach for the multi-mode resource-constrained project scheduling problem
    Messelis, Tommy
    De Causmaecker, Patrick
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2014, 233 (03) : 511 - 528