Two continuous-time assignment-based models for the multi-mode resource-constrained project scheduling problem

被引:11
|
作者
Gnaegi, Mario [1 ]
Rihm, Tom [1 ]
Zimmermann, Adrian [1 ]
Trautmann, Norbert [1 ]
机构
[1] Univ Bern, Dept Business Adm, Schuetzenmattstr 14, CH-3012 Bern, Switzerland
关键词
Operations research; Mixed-integer linear programming; Multi-mode resource-constrained project scheduling; FORMULATIONS;
D O I
10.1016/j.cie.2019.01.033
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In the multi-mode resource-constrained project scheduling problem, a set of precedence-related project activities and, for each activity, a set of alternative execution modes are given. Each activity requires some time and some scarce resources during execution; these requirements depend on the selected execution mode. Sought is a project schedule, i.e, a start time and an execution mode for each activity, such that the project makespan is minimized. In the literature, besides a large variety of specific solution approaches, several Mixed-Integer Linear Programming (MILP) models have been proposed for this problem. We present two novel MILP models that are based on mode-selection, resource-assignment and sequencing variables; we enhance the performance of the models by eliminating some symmetric solutions from the search space and by adding some redundant sequencing constraints for pairs and for triples of activities that cannot be processed in parallel. In a comparison with reference models from the literature, it turned out that the advantages of the novel models are a simple structure, an enhanced flexibility, and a superior performance when the range of the activities' durations is relatively large.
引用
收藏
页码:346 / 353
页数:8
相关论文
共 50 条
  • [41] Multi-mode resource-constrained project scheduling problem with multiple shifts and dynamic energy prices
    Peng, Wuliang
    Yu, Dongmin
    Xie, Fang
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2024,
  • [42] A faster exact method for solving the robust multi-mode resource-constrained project scheduling problem
    Bold, Matthew
    Goerigk, Marc
    OPERATIONS RESEARCH LETTERS, 2022, 50 (05) : 581 - 587
  • [43] A Modified NSGA-II for the Multiobjective Multi-mode Resource-Constrained Project Scheduling Problem
    Vanucci, Sanderson C.
    Bicalho, Rafael
    Carrano, Eduardo G.
    Takahashi, Ricardo H. C.
    2012 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2012,
  • [44] A multi-mode resource-constrained scheduling problem in the context of port operations
    Lorenzoni, Luciano Lessa
    Ahonen, Hannu
    Gomes de Alvarenga, Arlindo
    COMPUTERS & INDUSTRIAL ENGINEERING, 2006, 50 (1-2) : 55 - 65
  • [45] Comparing optimization modeling approaches for the multi-mode resource-constrained multi-project scheduling problem
    Kannimuthu, Marimuthu
    Raphael, Benny
    Ekambaram, Palaneeswaran
    Kuppuswamy, Ananthanarayanan
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2020, 27 (04) : 893 - 916
  • [46] An adaptive large neighbourhood search as a matheuristic for the multi-mode resource-constrained project scheduling problem
    Gerhards, Patrick
    Stuerck, Christian
    Fink, Andreas
    EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2017, 11 (06) : 774 - 791
  • [47] A Constraint Programming Formulation of the Multi-Mode Resource-Constrained Project Scheduling Problem for the Flexible Job Shop Scheduling Problem
    Yuraszeck, Francisco
    Montero, Elizabeth
    Canut-De-Bon, Dario
    Cuneo, Nicolas
    Rojel, Maximiliano
    IEEE ACCESS, 2023, 11 : 144928 - 144938
  • [48] Experimental Evaluation of Agent-based Approaches to Solving Multi-mode Resource-Constrained Project Scheduling Problem
    Ratajczak-Ropel, Ewa
    CYBERNETICS AND SYSTEMS, 2018, 49 (5-6) : 296 - 316
  • [49] A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem
    Elloumi, Sonda
    Fortemps, Philippe
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 205 (01) : 31 - 41
  • [50] A Hybrid Method for the Multi-Mode Resource-Constrained Project Scheduling Problem with Strip Packing like Resource Constraints
    Szendroi, E.
    PROCEEDINGS OF THE SEVENTH INTERNATIONAL CONFERENCE ON ENGINEERING COMPUTATIONAL TECHNOLOGY, 2010, 94