Two continuous-time assignment-based models for the multi-mode resource-constrained project scheduling problem

被引:11
|
作者
Gnaegi, Mario [1 ]
Rihm, Tom [1 ]
Zimmermann, Adrian [1 ]
Trautmann, Norbert [1 ]
机构
[1] Univ Bern, Dept Business Adm, Schuetzenmattstr 14, CH-3012 Bern, Switzerland
关键词
Operations research; Mixed-integer linear programming; Multi-mode resource-constrained project scheduling; FORMULATIONS;
D O I
10.1016/j.cie.2019.01.033
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In the multi-mode resource-constrained project scheduling problem, a set of precedence-related project activities and, for each activity, a set of alternative execution modes are given. Each activity requires some time and some scarce resources during execution; these requirements depend on the selected execution mode. Sought is a project schedule, i.e, a start time and an execution mode for each activity, such that the project makespan is minimized. In the literature, besides a large variety of specific solution approaches, several Mixed-Integer Linear Programming (MILP) models have been proposed for this problem. We present two novel MILP models that are based on mode-selection, resource-assignment and sequencing variables; we enhance the performance of the models by eliminating some symmetric solutions from the search space and by adding some redundant sequencing constraints for pairs and for triples of activities that cannot be processed in parallel. In a comparison with reference models from the literature, it turned out that the advantages of the novel models are a simple structure, an enhanced flexibility, and a superior performance when the range of the activities' durations is relatively large.
引用
收藏
页码:346 / 353
页数:8
相关论文
共 50 条
  • [31] A hybrid approach for solving multi-mode resource-constrained project scheduling problem in construction
    Roslon, Jerzy Hubert
    Kulejewski, Janusz Edward
    OPEN ENGINEERING, 2019, 9 (01): : 7 - 13
  • [32] A Decomposition Method for the Multi-Mode Resource-Constrained Multi-Project Scheduling Problem (MRCMPSP)
    Kuehn, Mathias
    Dirkmann, Sebastian
    Voelker, Michael
    Schmidt, Thorsten
    OPERATIONS RESEARCH PROCEEDINGS 2016, 2018, : 521 - 526
  • [33] Generalized Benders decomposition-based matheuristics for the multi-mode resource-constrained project scheduling problem
    Ramos, Alfredo S.
    Miranda-Gonzalez, Pablo A.
    Olivares-Benitez, Elias
    Mendoza, Abraham
    OPTIMIZATION AND ENGINEERING, 2025,
  • [34] Memetic algorithm for multi-mode resource-constrained project scheduling problems
    Shixin Liu
    Di Chen
    Yifan Wang
    Journal of Systems Engineering and Electronics, 2014, 25 (04) : 609 - 617
  • [35] Continuous-time formulations for multi-mode project scheduling
    Sayah, David
    COMPUTERS & OPERATIONS RESEARCH, 2023, 152
  • [36] Local search for nonpreemptive multi-mode resource-constrained project scheduling
    Kolisch, R
    Drexl, A
    IIE TRANSACTIONS, 1997, 29 (11) : 987 - 999
  • [37] Scatter Search for Multi-mode Resource-constrained Project Scheduling Problems
    Pourghaderi, A. R.
    Torabi, S. A.
    Talebi, J.
    IEEM: 2008 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-3, 2008, : 163 - 167
  • [38] Multi-mode resource-constrained project scheduling with uncertain activity cost
    Xie, Fang
    Li, Haitao
    Xu, Zhe
    EXPERT SYSTEMS WITH APPLICATIONS, 2021, 168
  • [39] Memetic algorithm for multi-mode resource-constrained project scheduling problems
    Liu, Shixin
    Chen, Di
    Wang, Yifan
    JOURNAL OF SYSTEMS ENGINEERING AND ELECTRONICS, 2014, 25 (04) : 609 - 617
  • [40] A Benders decomposition algorithm for the multi-mode resource-constrained multi-project scheduling problem with uncertainty
    Sadeghloo, Maryam
    Emami, Saeed
    Divsalar, Ali
    ANNALS OF OPERATIONS RESEARCH, 2024, 339 (03) : 1637 - 1677