THE QUAY CRANE DEPLOYMENT PROBLEM AT A MARITIME CONTAINER TERMINAL

被引:0
|
作者
Legato, Pasquale [1 ]
Gulli, Daniel [2 ]
Trunfio, Roberto [2 ]
机构
[1] Univ Calabria, Dipartimento Elettron Informat & Sistemist, Via P Bucci,Cubo 41C, I-87036 Arcavacata Di Rende, CS, Italy
[2] CESIC, NEC, Ctr Super Ingn Comput, I-87036 Cosenza, Italy
关键词
Quay crane deployment problem; scheduling problem; maritime container terminals; discrete-event simulation; optimization;
D O I
暂无
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
Container unloading/loading at marine container terminals (MCTs) is a key logistic process, to which some research efforts have been addressed by using mathematical programming models formulated in a deterministic-static environment. Vice versa, DES models in a stochastic-dynamic environment are well capable of representing the entire process. Hence, simulation results to be an effective planning and control tool for decision making at all decisional levels. Here we remark that optimal decisions in MCTs may be practically pursued by modelling the whole MCT and focusing attention on the core logistic processes, while representing in a simplified manner the remainder. We focus on the operational management of the cranes deployed along the quay, during the container unloading/loading process at a given number of vessels according to a previously planned berth-schedule. We suggest a two-phase approach to the quay crane deployment problem: in the first phase an IP model is used to decide when and how many cranes must be assigned to each vessel; afterwards, we propose a heuristics to determine which specific crane should be assigned to a vessel. We indicate how this approach can be successfully integrated in a DES model, already available, to support dynamic assignment of cranes to berthed vessels.
引用
收藏
页码:53 / +
页数:3
相关论文
共 50 条
  • [41] A genetic algorithm for the integrated berth allocation and quay crane scheduling problem in container terminals
    Ren, Jie
    Shang, Xiao Ting
    Cao, Jin Xin
    [J]. PROCEEDINGS OF THE 2015 4TH INTERNATIONAL CONFERENCE ON SENSORS, MEASUREMENT AND INTELLIGENT MATERIALS, 2016, 43 : 1036 - 1040
  • [42] A multiple-crane-constrained scheduling problem in a container terminal
    Bish, EK
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2003, 144 (01) : 83 - 107
  • [43] A fuzzy vehicle-crane scheduling problem in container terminal
    Zhou, Pengfel
    Guo, Zijian
    Lin, Li
    [J]. DYNAMICS OF CONTINUOUS DISCRETE AND IMPULSIVE SYSTEMS-SERIES B-APPLICATIONS & ALGORITHMS, 2006, 13E : 3593 - 3598
  • [44] Interblock crane deployment in container terminals
    Chung, RK
    Li, CL
    Lin, WQ
    [J]. TRANSPORTATION SCIENCE, 2002, 36 (01) : 79 - 93
  • [45] YARD CRANE DEPLOYMENT IN CONTAINER TERMINALS
    Huang, Shell Ying
    Li, Ya
    Lau, Meimei
    Tay, Teck Chin
    [J]. PROCEEDINGS OF THE 2014 WINTER SIMULATION CONFERENCE (WSC), 2014, : 1735 - 1746
  • [46] Simultaneous Load Scheduling of Quay Crane and Yard Crane in Port Container Terminals
    Lee, Der-Horng
    Cao, Zhi
    Chen, Jiang Hang
    Cao, Jin Xin
    [J]. TRANSPORTATION RESEARCH RECORD, 2009, (2097) : 62 - 69
  • [47] A genetic algorithm approach for quay crane scheduling with non-interference constraints at Narvik container terminal
    Hakam, M. H.
    Solvang, W. D.
    Hammervoll, T.
    [J]. INTERNATIONAL JOURNAL OF LOGISTICS-RESEARCH AND APPLICATIONS, 2012, 15 (04) : 269 - 281
  • [48] A robust multiobjective model for the integrated berth and quay crane scheduling problem at seaside container terminals
    Abtin Nourmohammadzadeh
    Stefan Voß
    [J]. Annals of Mathematics and Artificial Intelligence, 2022, 90 : 831 - 853
  • [49] Multi-Terminal Berth and Quay Crane Joint Scheduling in Container Ports Considering Carbon Cost
    Jiang, Meixian
    Feng, Jiajia
    Zhou, Jian
    Zhou, Lin
    Ma, Fangzheng
    Wu, Guanghua
    Zhang, Yuqiu
    [J]. SUSTAINABILITY, 2023, 15 (06)
  • [50] An efficient algorithm for solving a new mathematical model for a quay crane scheduling problem in container ports
    Tavakkoli-Moghaddam, R.
    Makui, A.
    Salahi, S.
    Bazzazi, M.
    Taheri, F.
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2009, 56 (01) : 241 - 248