共 50 条
- [21] A NOVEL STRATEGY FOR BERTH AND QUAY CRANE ALLOCATION UNDER DISRUPTION IN CONTAINER TERMINAL [J]. INTERNATIONAL JOURNAL OF INNOVATIVE COMPUTING INFORMATION AND CONTROL, 2016, 12 (05): : 1535 - 1551
- [23] CONTAINER TERMINAL BERTH-QUAY CRANE CAPACITY PLANNING BASED ON MARKOV CHAIN [J]. PROMET-TRAFFIC & TRANSPORTATION, 2021, 33 (02): : 267 - 281
- [27] Multi-stage rescheduling decision of container terminal quay crane considering the fault [J]. Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2021, 41 (12): : 3321 - 3335
- [28] A Method of Quay Crane Scheduling For Container Terminals [J]. NATURAL RESOURCES AND SUSTAINABLE DEVELOPMENT II, PTS 1-4, 2012, 524-527 : 824 - 827
- [30] The Influence of the Quay Crane Traveling Time for the Quay Crane Scheduling Problem [J]. INTERNATIONAL MULTICONFERENCE OF ENGINEERS AND COMPUTER SCIENTIST, IMECS 2012, VOL II, 2012, : 1298 - 1301