Energy-Aware Integrated Scheduling for Quay Crane and IGV in Automated Container Terminal

被引:1
|
作者
Luo, Yuedi [1 ]
Liang, Xiaolei [1 ]
Zhang, Yu [2 ]
Tang, Kexin [2 ]
Li, Wenting [1 ]
机构
[1] Wuhan Univ Sci & Technol, Sch Automobile & Traff Engn, Wuhan 430070, Peoples R China
[2] Wuhan Univ Technol, Sch Transportat & Logist Engn, Wuhan 430063, Peoples R China
基金
中国国家自然科学基金;
关键词
integrated scheduling; loading operation; loading order; dimension-by-dimension mutation sparrow search algorithm; OPTIMIZATION; ALGORITHM;
D O I
10.3390/jmse12030376
中图分类号
U6 [水路运输]; P75 [海洋工程];
学科分类号
0814 ; 081505 ; 0824 ; 082401 ;
摘要
In this study, we address the integrated scheduling problem involving quay cranes and IGVs in automated terminals. We construct a mixed-integer planning model with the aim of minimizing the total energy consumption during quay crane and IGV operations, focusing on the loading-operation mode. The model considers the impact of the actual stowage of container ships on the loading order. We propose a dimension-by-dimension mutation sparrow search algorithm to optimize the model's solution quality. Building upon the standard sparrow search algorithm, we incorporate cat mapping to enhance the diversity of the initial sparrow population. To improve global search in the early stage and local search in the later stage of the algorithm, we introduce an adaptive t-distribution mutation strategy. Finally, a total of 12 instances with container counts containing 30, 100, and 250 were designed for experiments to validate the effectiveness of the model and algorithm. The experiments demonstrate that, by appropriately increasing the number of quay cranes, configuring more than two or three IGVs can achieve optimal energy consumption for overall operations.
引用
收藏
页数:26
相关论文
共 50 条
  • [1] Integrated internal truck, yard crane and quay crane scheduling in a container terminal considering energy consumption
    He, Junliang
    Huan, Youfang
    Yan, Wei
    Wang, Shuaian
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2015, 42 (05) : 2464 - 2487
  • [2] Quay crane scheduling in automated container terminal for the trade-off between operation efficiency and energy consumption
    Tan, Caimao
    Yan, Wei
    Yue, Jiantao
    [J]. ADVANCED ENGINEERING INFORMATICS, 2021, 48
  • [3] Quay crane scheduling in automated container terminal for the trade-off between operation efficiency and energy consumption
    Tan, Caimao
    Yan, Wei
    Yue, Jiantao
    [J]. Advanced Engineering Informatics, 2021, 48
  • [4] Integrated of Berth Schedule and Quay Crane Allocation in Container Terminal
    Qian Jifeng
    Zhu Xiaoning
    Liu Yongjun
    [J]. APPLIED SCIENCE, MATERIALS SCIENCE AND INFORMATION TECHNOLOGIES IN INDUSTRY, 2014, 513-517 : 1437 - 1444
  • [5] Integrated operation models with quay crane maintenance in a container terminal
    Wang, Tingsong
    Gao, Guangxu
    Wang, Kai
    Shi, Jia
    [J]. OCEAN & COASTAL MANAGEMENT, 2024, 251
  • [6] Research on coupling scheduling of quay crane dispatch and configuration in the container terminal
    Liang, Chengji
    Fan, Lubin
    Xu, Dehong
    Ding, Yi
    Gen, Mitsuo
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2018, 125 : 649 - 657
  • [7] Quay crane scheduling in container terminals
    Ng, W. C.
    Mak, K. L.
    [J]. ENGINEERING OPTIMIZATION, 2006, 38 (06) : 723 - 737
  • [8] Quay crane scheduling with time windows constraints for automated container port
    Wei, Minghui
    He, Junliang
    Tan, Caimao
    Yue, Jiantao
    Yu, Hang
    [J]. OCEAN & COASTAL MANAGEMENT, 2023, 231
  • [9] Energy-aware control for automated container terminals using integrated flow shop scheduling and optimal control
    Xin, Jianbin
    Negenborn, Rudy R.
    Lodewijks, Gabriel
    [J]. TRANSPORTATION RESEARCH PART C-EMERGING TECHNOLOGIES, 2014, 44 : 214 - 230
  • [10] A branch-and-cut algorithm for the quay crane scheduling problem in a container terminal
    Moccia, L
    Cordeau, JF
    Gaudioso, M
    Laporte, G
    [J]. NAVAL RESEARCH LOGISTICS, 2006, 53 (01) : 45 - 59