Quay crane scheduling in automated container terminal for the trade-off between operation efficiency and energy consumption

被引:33
|
作者
Tan, Caimao [1 ]
Yan, Wei [1 ]
Yue, Jiantao [2 ]
机构
[1] Shanghai Maritime Univ, China Inst FTZ Supply Chain, Shanghai, Peoples R China
[2] Shanghai Maritime Univ, Inst Logist Sci & Engn, Shanghai, Peoples R China
基金
中国国家自然科学基金;
关键词
Automated container terminal; Quay crane scheduling; Mixed integrated programming; Automated quay crane; Trade-off; DOUBLE-CYCLING PROBLEM; PORT;
D O I
10.1016/j.aei.2021.101285
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
At present, the automation of handling equipment has changed the operation mode in the automated container terminal. This paper investigates the automated quay crane scheduling problem (AQCSP) for the automated container terminal. The operation process of AQCSP is decomposed, and formulated it as a mixed integrated programming model. In the numerical experiments, the relation between operation efficiency and energy consumption has been quantitative analyzed by case study. Moreover, the sensitivity analysis of the ratios for all tasks in a vessel bay and the tasks in each stack are also presented. The findings of this study will provide a theoretical reference for the study on the trade-off operation efficiency and energy consumption on the operational level.
引用
收藏
页数:11
相关论文
共 50 条
  • [1] Quay crane scheduling in automated container terminal for the trade-off between operation efficiency and energy consumption
    Tan, Caimao
    Yan, Wei
    Yue, Jiantao
    [J]. Advanced Engineering Informatics, 2021, 48
  • [2] Yard crane scheduling in a container terminal for the trade-off between efficiency and energy consumption
    He, Junliang
    Huang, Youfang
    Yan, Wei
    [J]. ADVANCED ENGINEERING INFORMATICS, 2015, 29 (01) : 59 - 75
  • [3] Berth allocation and quay crane assignment in a container terminal for the trade-off between time-saving and energy-saving
    He, Junliang
    [J]. ADVANCED ENGINEERING INFORMATICS, 2016, 30 (03) : 390 - 405
  • [4] Energy-Aware Integrated Scheduling for Quay Crane and IGV in Automated Container Terminal
    Luo, Yuedi
    Liang, Xiaolei
    Zhang, Yu
    Tang, Kexin
    Li, Wenting
    [J]. JOURNAL OF MARINE SCIENCE AND ENGINEERING, 2024, 12 (03)
  • [5] Integrated internal truck, yard crane and quay crane scheduling in a container terminal considering energy consumption
    He, Junliang
    Huan, Youfang
    Yan, Wei
    Wang, Shuaian
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2015, 42 (05) : 2464 - 2487
  • [6] Integrated operation models with quay crane maintenance in a container terminal
    Wang, Tingsong
    Gao, Guangxu
    Wang, Kai
    Shi, Jia
    [J]. OCEAN & COASTAL MANAGEMENT, 2024, 251
  • [7] Research on coupling scheduling of quay crane dispatch and configuration in the container terminal
    Liang, Chengji
    Fan, Lubin
    Xu, Dehong
    Ding, Yi
    Gen, Mitsuo
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2018, 125 : 649 - 657
  • [8] Optimisation of berth and quay crane joint scheduling considering efficiency and energy consumption
    Wen, Dusu
    Li, Xumao
    Ren, Xiaoyun
    Ji, Mingjun
    Long, Qiuxi
    [J]. INTERNATIONAL JOURNAL OF SHIPPING AND TRANSPORT LOGISTICS, 2023, 17 (04) : 487 - 505
  • [9] Quay crane scheduling with time windows constraints for automated container port
    Wei, Minghui
    He, Junliang
    Tan, Caimao
    Yue, Jiantao
    Yu, Hang
    [J]. OCEAN & COASTAL MANAGEMENT, 2023, 231
  • [10] A branch-and-cut algorithm for the quay crane scheduling problem in a container terminal
    Moccia, L
    Cordeau, JF
    Gaudioso, M
    Laporte, G
    [J]. NAVAL RESEARCH LOGISTICS, 2006, 53 (01) : 45 - 59