Optimisation of berth and quay crane joint scheduling considering efficiency and energy consumption

被引:0
|
作者
Wen, Dusu [1 ,2 ]
Li, Xumao [3 ,4 ,5 ]
Ren, Xiaoyun [6 ]
Ji, Mingjun [1 ,7 ]
Long, Qiuxi [8 ]
机构
[1] Dalian Maritime Univ, Coll Transportat Engn, Dalian 116026, Peoples R China
[2] CCCC Water Transportat Consultants Co Ltd, Beijing, Peoples R China
[3] Minist Transport, Transport Planning & Res Inst, Beijing 100028, Peoples R China
[4] Lab Traff & Transport Planning Digitalizat, Beijing 100028, Peoples R China
[5] Southeast Univ, Sch Transportat, Nanjing 210096, Peoples R China
[6] Xiangtan Univ, Xiangtan 411105, Hunan, Peoples R China
[7] Dalian Maritime Univ, Coll Transportat Engn, Dalian 116026, Peoples R China
[8] Australian Natl Univ, Coll Engn & Comp Sci, Canberra, ACT 2601, Australia
关键词
container terminal; joint scheduling; multi-objective optimisation; particle swarm algorithm; PSO; energy consumption; ALLOCATION; ASSIGNMENT;
D O I
10.1504/IJSTL.2023.136048
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In order to reduce the energy consumption of ships and quay crane in the port area, the joint scheduling problem of berth and quay crane is studied on the premise that ship arrival information and terminal status information are known. Considering the needs of the shipping company and the interests of the port owner, a multi-objective mixed integer programming model is established to maximise the operational efficiency of ships in the port and minimise the total cost of the terminal, and a local search strategy is designed to solve the quay crane scheduling problem between adjacent ships. At the same time, combining topological structure and iterative coefficient mechanism, an improved particle swarm optimisation algorithm is designed to solve the model, and the Pareto non-inferior solution set is obtained. Finally, the applicability and effectiveness of the proposed model and algorithm are verified by comparison of algorithms with different scales and analysis of multi-scenario results.
引用
收藏
页码:487 / 505
页数:20
相关论文
共 50 条
  • [1] Quay crane scheduling for an indented berth
    Lee, Der-Horng
    Chen, Jiang Hang
    Cao, Jin Xin
    [J]. ENGINEERING OPTIMIZATION, 2011, 43 (09) : 985 - 998
  • [2] A novel robust exact decomposition algorithm for berth and quay crane allocation and scheduling problem considering uncertainty and energy efficiency
    Chargui, Kaoutar
    Zouadi, Tarik
    Sreedharan, V. Raja
    El Fallahi, Abdellah
    Reghioui, Mohamed
    [J]. OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2023, 118
  • [3] Multi-Terminal Berth and Quay Crane Joint Scheduling in Container Ports Considering Carbon Cost
    Jiang, Meixian
    Feng, Jiajia
    Zhou, Jian
    Zhou, Lin
    Ma, Fangzheng
    Wu, Guanghua
    Zhang, Yuqiu
    [J]. SUSTAINABILITY, 2023, 15 (06)
  • [4] Heuristics for quay crane scheduling at indented berth
    Chen, Jiang Hang
    Lee, Der-Horng
    Cao, Jin Xin
    [J]. TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2011, 47 (06) : 1005 - 1020
  • [5] Integrated internal truck, yard crane and quay crane scheduling in a container terminal considering energy consumption
    He, Junliang
    Huan, Youfang
    Yan, Wei
    Wang, Shuaian
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2015, 42 (05) : 2464 - 2487
  • [6] Coordinated Scheduling of Berth and Quay Crane Based on MAS
    Zhao, Hui
    Cheng, Liqin
    [J]. IITAW: 2009 THIRD INTERNATIONAL SYMPOSIUM ON INTELLIGENT INFORMATION TECHNOLOGY APPLICATIONS WORKSHOPS, 2009, : 328 - 331
  • [7] Berth Allocation in Transshipment Ports by Considering Quay Crane Coverage and Ship Fuel Consumption
    Yu, Shucheng
    Wang, Bochen
    Zhang, Si
    Zhen, Lu
    [J]. ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2022, 39 (03)
  • [8] Quay crane scheduling problem with considering tidal impact and fuel consumption
    Shucheng Yu
    Shuaian Wang
    Lu Zhen
    [J]. Flexible Services and Manufacturing Journal, 2017, 29 : 345 - 368
  • [9] Quay crane scheduling problem with considering tidal impact and fuel consumption
    Yu, Shucheng
    Wang, Shuaian
    Zhen, Lu
    [J]. FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2017, 29 (3-4) : 345 - 368
  • [10] Berth and quay crane allocation: a moldable task scheduling model
    Blazewicz, J.
    Cheng, T. C. E.
    Machowiak, M.
    Oguz, C.
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2011, 62 (07) : 1189 - 1197