A robust multiobjective model for the integrated berth and quay crane scheduling problem at seaside container terminals

被引:0
|
作者
Abtin Nourmohammadzadeh
Stefan Voß
机构
[1] University of Hamburg,Institute of Information Systems
关键词
Berth and quay crane scheduling; Maritime container terminal; Robust optimisation;
D O I
暂无
中图分类号
学科分类号
摘要
The ever increasing demand for container transportation has led to the congestion of maritime container terminals in the world. In this work, the two interrelated problems of berth and quay crane scheduling are considered in an integrated multiobjective mathematical model. A special character of this model is that the arrival times of vessels and the failure (working) times of quay cranes are not deterministic and can vary based on some scenarios. Hence, a robust model is devised for the problem having three objectives of minimising the deviations from target berthing locations and times as well as departure delays of all vessels. This robust optimisation seeks to minimise the value of the objectives regarding all the scenarios. An exact solution approach based on the 𝜖-constraint method by the Gurobi software is applied. Moreover, regarding the complexity of the problem, two Simulated Annealing (SA) based metaheuristics, namely a Multi-Objective Simulated Annealing (MOSA) and a Pareto Simulated Annealing (PSA) approach are adapted with a novel solution encoding scheme. The three methods are compared based on some multiobjective metrics and a statistical test. The advantage of the integration of berth and quay crane scheduling is examined as well.
引用
收藏
页码:831 / 853
页数:22
相关论文
共 50 条
  • [1] A robust multiobjective model for the integrated berth and quay crane scheduling problem at seaside container terminals
    Nourmohammadzadeh, Abtin
    Voss, Stefan
    ANNALS OF MATHEMATICS AND ARTIFICIAL INTELLIGENCE, 2022, 90 (7-9) : 831 - 853
  • [2] A genetic algorithm for the integrated berth allocation and quay crane scheduling problem in container terminals
    Ren, Jie
    Shang, Xiao Ting
    Cao, Jin Xin
    PROCEEDINGS OF THE 2015 4TH INTERNATIONAL CONFERENCE ON SENSORS, MEASUREMENT AND INTELLIGENT MATERIALS, 2016, 43 : 1036 - 1040
  • [3] Disruption recovery model for berth and quay crane scheduling in container terminals
    Zeng, Qingcheng
    Yang, Zhongzhen
    Hu, Xiangpei
    ENGINEERING OPTIMIZATION, 2011, 43 (09) : 967 - 983
  • [4] An Online Model of Berth and Quay Crane Integrated Allocation in Container Terminals
    Zheng, Feifeng
    Qiao, Longliang
    Liu, Ming
    COMBINATORIAL OPTIMIZATION AND APPLICATIONS, (COCOA 2015), 2015, 9486 : 721 - 730
  • [5] Integrated discrete berth allocation and quay crane scheduling in port container terminals
    Lee, Der-Horng
    Wang, Hui Qiu
    ENGINEERING OPTIMIZATION, 2010, 42 (08) : 747 - 761
  • [6] A Simultaneous Integrated Model With Multiobjective For Continuous Berth Allocation And Quay Crane Scheduling Problem
    Idris, Nurhidayu
    Zainuddin, Zaitul Marlizawati
    2016 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING, MANAGEMENT SCIENCE AND APPLICATIONS (ICIMSA), 2016,
  • [7] Model for disruption management of berth allocation & quay crane scheduling in container terminals
    Zeng, Qing-Cheng
    Hu, Xiang-Pei
    Yang, Zhong-Zhen
    Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2010, 30 (11): : 2026 - 2035
  • [8] A survey of berth allocation and quay crane scheduling problems in container terminals
    Bierwirth, Christian
    Meisel, Frank
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 202 (03) : 615 - 627
  • [9] A Quay Crane Scheduling Model in Container Terminals
    Tang, Qi
    ADVANCES IN SWARM INTELLIGENCE, PT 2, PROCEEDINGS, 2010, 6146 : 283 - 290
  • [10] Simultaneous Optimization of Berth Allocation, Quay Crane Assignment and Quay Crane Scheduling Problems in Container Terminals
    Aras, Necati
    Turkogullari, Yavuz
    Taskin, Z. Caner
    Altinel, Kuban
    OPERATIONS RESEARCH PROCEEDINGS 2012, 2014, : 101 - 107