A Simultaneous Integrated Model With Multiobjective For Continuous Berth Allocation And Quay Crane Scheduling Problem

被引:0
|
作者
Idris, Nurhidayu [1 ]
Zainuddin, Zaitul Marlizawati [1 ,2 ]
机构
[1] Univ Teknol Malaysia, Dept Math Sci, Fac Sci, Johor Baharu, Malaysia
[2] Univ Teknol Malaysia, Ctr Ind & Appl Math, Johor Baharu, Malaysia
关键词
berth allocation; quay crane scheduling; multiobjectives; integration;
D O I
暂无
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper presents the simultaneous integration model of berth allocation and quay crane scheduling. Berths and quay cranes are both critical resources in port container terminals. The mathematical model uses a mixed integer linear programming with multiple objectives generated by considering various practical constraints. Small data instances have been taken to validate the integrated model. A numerical experiment was conducted by using LINGO programming software to evaluate the performance and to obtain the exact solution of the suggested model.
引用
收藏
页数:5
相关论文
共 50 条
  • [1] Development of Integrated Model For Continuous Berth Allocation Problem and Quay Crane Scheduling With Non Crossing Constraint
    Basri, Azyanzuhaila Hasan
    Zainuddin, Zaitul Marlizawati
    [J]. STATISTICS AND OPERATIONAL RESEARCH INTERNATIONAL CONFERENCE (SORIC 2013), 2014, 1613 : 113 - 121
  • [2] The simultaneous berth and quay crane allocation problem
    Imai, Akio
    Chen, Hsieh Chia
    Nishimura, Etsuko
    Papadimitriou, Stratos
    [J]. TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2008, 44 (05) : 900 - 920
  • [3] A robust multiobjective model for the integrated berth and quay crane scheduling problem at seaside container terminals
    Abtin Nourmohammadzadeh
    Stefan Voß
    [J]. Annals of Mathematics and Artificial Intelligence, 2022, 90 : 831 - 853
  • [4] A robust multiobjective model for the integrated berth and quay crane scheduling problem at seaside container terminals
    Nourmohammadzadeh, Abtin
    Voss, Stefan
    [J]. ANNALS OF MATHEMATICS AND ARTIFICIAL INTELLIGENCE, 2022, 90 (7-9) : 831 - 853
  • [5] MIP approaches for the integrated berth allocation and quay crane assignment and scheduling problem
    Agra, Agostinho
    Oliveira, Maryse
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2018, 264 (01) : 138 - 148
  • [6] An enriched model for the integrated berth allocation and quay crane assignment problem
    Raa, Birger
    Dullaert, Wout
    Van Schaeren, Rowan
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2011, 38 (11) : 14136 - 14147
  • [7] Robust Scheduling for Berth Allocation and Quay Crane Assignment Problem
    Rodriguez-Molins, M.
    Salido, M. A.
    Barber, F.
    [J]. MATHEMATICAL PROBLEMS IN ENGINEERING, 2014, 2014
  • [8] A genetic algorithm for the integrated berth allocation and quay crane scheduling problem in container terminals
    Ren, Jie
    Shang, Xiao Ting
    Cao, Jin Xin
    [J]. PROCEEDINGS OF THE 2015 4TH INTERNATIONAL CONFERENCE ON SENSORS, MEASUREMENT AND INTELLIGENT MATERIALS, 2016, 43 : 1036 - 1040
  • [9] Simultaneous Berth and Quay Crane Allocation Problem in Container Terminal
    Lu, Zhiqiang
    Han, Xiaole
    Xi, Lifeng
    [J]. ADVANCED SCIENCE LETTERS, 2011, 4 (6-7) : 2113 - 2118
  • [10] Multiobjective hybrid genetic algorithm for quay crane scheduling in berth allocation planning
    Liang, Chengji
    Lin, Lin
    Jo, Jungbok
    [J]. International Journal of Manufacturing Technology and Management, 2009, 16 (1-2) : 127 - 146