共 50 条
- [1] Development of Integrated Model For Continuous Berth Allocation Problem and Quay Crane Scheduling With Non Crossing Constraint [J]. STATISTICS AND OPERATIONAL RESEARCH INTERNATIONAL CONFERENCE (SORIC 2013), 2014, 1613 : 113 - 121
- [3] A robust multiobjective model for the integrated berth and quay crane scheduling problem at seaside container terminals [J]. Annals of Mathematics and Artificial Intelligence, 2022, 90 : 831 - 853
- [8] A genetic algorithm for the integrated berth allocation and quay crane scheduling problem in container terminals [J]. PROCEEDINGS OF THE 2015 4TH INTERNATIONAL CONFERENCE ON SENSORS, MEASUREMENT AND INTELLIGENT MATERIALS, 2016, 43 : 1036 - 1040